L2mu System - Status

L2mu System - Status. DONE. Track Finding (main data processing) Next: SLIC Upstream and Downstream. SLICs. UPSTREAM; CICs and SFOs. CIC crate; hooked into place by June 8 Boards return from stuffing ~end of May Bench tests (MIS-Eng.) done by June 8

kali
Download Presentation

L2mu System - Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. L2mu System - Status DONE Track Finding (main data processing) Next: SLIC Upstream and Downstream SLICs UPSTREAM; CICs and SFOs • CIC crate; hooked into place by June 8 • Boards return from stuffing ~end of May • Bench tests (MIS-Eng.) done by June 8 • Ship to fnal, then full cabling at MCH3 UPSTREAM fully hooked up by mid-to-late June • Worst case scenario: no downstream yet – we can; • Check all cabling /connections: run BIST tests • over all sources, cross check data origin (headers) • Exercise SLIC-run-init (SCL-init if SCL available) • Receive/Dump a few events – Formats,Endianess,etc. • First look at DSP-times, Event Sizes, at very limited • speeds (by re-routing SLIC output to VME -- dump) next; DOWNSTREAM; MBTs and Alphas

  2. Downstream - Alphas X Two major problems remaining • (1) DMA – data input • Last week at UMich, problem solved • (R.S. DØ + S.M. CDF) – standing ovation • Current boards acquire 8 “white wire” mods • Upgrade incorporated into future production • “future production” does not delay muons • Current boards destined to Cal+Muo+Global (2) PIO – board to board Mbus Communications Current understanding: an fpga programming problem, (rather than a Bus problem) – Joint effort DØ + CDF Highest priority: estimated ~2 weeks, will know soon -- Big decision next week; whether to order remaining boards prior to seeing PIO solution (?)... Circumventing PIO – OK for low rate Test Mode • have single alpha performing worker + administrator • takes little extra software, plus a few kluges in system • Note: Current design of “Beta” approved • Project (Virginia+Orsay+ Maryland) goes ahead

  3. Downstream - MBTs Last steps remaining (priority ordered) (1) Enable the SCL functions • FW-SCL (L1+L2) into MBT-daughter board • L1 decision formatted, buffered, broadcast (all SLICs) • L2 decision stored in buffer accessible by MBus – • raises a pin in backplane to trigger PIO-read by Alpha • Other Functions; • request SCL-init • raise L1-busy ( L2 input buffers full, stop L1 ) • raise L2 busy (L2 output buffers full, stop L2 ) Status: firmware mostly completed, D.Baden @ fnal, testing as we speak... (2) Multichannel Broadcasts (2) Multichannel Broadcasts • HotLinks-to-MagicBus-to-Alphas ; Firmware done, • needs testing (was held by DMA -- ~1week job) (3) Additional MBT firmware steps • Cypress output from preprocessor to Global (MBus PIO to MBT) • L2Global answer to L2 HWFW (hardware exists, being debugged) GOAL: Mu+Cal Online in August

  4. L2mu System - Status (cont.) Cables • all cables in place, except; • CIC (14)  SLIC (16) Simulator • All SLIC algorithms in place • (4 stub finders, 2 L1 reporters) • All Alpha algorithms in place • (Central & Forward track builders) • Framework done/tested, Input-to-Ntup • Now adding the Lookup Tables (versions) • Expect to run from CVS next week • Exercise + Tune + Test Robustness of all • algorithms with simulator – Online links • from the same files, reads same tables, etc. Note: SLIC+Alpha processors do the track finding. Trigger decisions are only made by L2-Global. Development of Global needs a functioning Alpha. SLIC: current development work is online monitoring and error handling

  5. I – Remarks on Run-II L2mu • Dimuons • First time we trigger on A-stubs; • Fundamentally different from higher thresholds • Likely one of the strengths of L2 ( inherits CFT • coincidence at L1, adds Aφ granularity + PDT • track residuals. • Dimuons with A-stubs  a much faster collection • of J/ψ ‘s than in Run-I (Eff’s, p-Calib, p-Resoln) • Early run: optimize bandwidth to collect J/ψ ‘s • Example: L1(μ+μ–) + L2(M&P) + L3(μ μ Mass) • in // with special runs on other subdetectors • (expected J/ψ visibility of 0.1Hz at 1.E31/cm2/s) • Another (and faster) control sample: • Muon-in-jet is a bona-fide guarantee of μ-quality • Use higher threshold single tracks to study A-stubs • Example: L1(μ+jet) + L2(M&P) + L3(μ-in-jet) • (cross section large enough for a special run) (*100 – thres&η)

  6. II – “Prove that L2mu is working” i.e. we get every muon (efficiency) we reject junk (rates, purity) Job: Monitor the efficiency as nearly online as possible L2 single track Efficiency = #L2 pass (for an ID-controlled sample) #L1 pass • it is an approximate efficiency (ID bias) • value depends on LMT of either trigger • From Run-I; an effective ID control is • loose muon (to minimize bias) • inside jet (to certify beam origin) • --but jet introduces (L1) CFT bias... • Opp. φ-hemisphere to leading jet • obs: more accurate ID with less bias (eye scan, • dimuon resonances etc.) come only much later online offline Two examples A. Maciel (NIU) Muon L-2

  7. II-1. L2mu Eff. Monitoring Online Possible with a L2-monitor trigger L1*L2*L3 L1;mu+jet , lowest jet threshold, 3 layer muons (4 GeV thresh.) prescale as needed (or raise jet) muon configurable as L , M , T L2; mark and pass (1mu w/ L1) L3;apply ID-control filter  loose muon (L1 tagged) inside jet • performance histos can go to Examine • prescaled full readout of L2 data to tape • difficult to monitor lowest Pt threshold A. Maciel (NIU) Muon L-2

  8. II-2. L2mu Eff. Monitoring Offline • Building a control sample: • Unbiased (virtual) trigger • ID-control selection Unbiased Virtual Trigger Bits, set upon reconstruction of ALL stream. MU_UNBIASED , CFT_UNBIASED , CAL_UNBIASED etc... Where MU_UNBIASED = .OR. of all triggers w/out Muons MU_UNBIASED .AND. CFT_UNBIASED is effectively an offline mark&pass sample for both L1mu and L2mu Apply ID-control filter to this sample and extract efficiencies from trigger bits Apply ID-control filter to L2µ passed events in this sample and examine purity (rejection) A. Maciel (NIU) Muon L-2