Explore the purpose and components of a full-size prototype designed to test electrical and mechanical performance. Discover where, when, and by whom the components are built, assembled, and tested, along with the scheduled timeline for various fabrication and testing phases.
E N D
Stave 09/250 • Define (redefine?) purpose • What it is • What tests • Where and by whom: • components are built • assembled • tested • Schedule
Purpose? • Full size prototype to test • Electrical Operation • Group’s Ability to • Assemble • De-bug • Disassemble • Handle • Ship • Determine Practicality of Design • Mechanical Performance
What is it • 1.2m? • With ‘side mounted’ EoS ? • EoS ? • Edge/Double-edge Mounted ? • Mounted to what ? Shipped in what? • Ti or stainless pipes ? Fittings ? • Style of tape (reference/shield) • Serial or DC-DC • HV grouping
What Tests • Electrical operation • Noise f(module location) • f(proximity) • f(grounding) • f(cable length) … • Mechanical Performance? • Distortions under different conditions • Normal power fluctuations during triggering/read-out • Various failure modes
Schedule • Define Stave (inclcore,module,power…) 1/4/12 • Fabricate Core/test 1/5/12 • Modules fabricated/test 1/7/12 • EoS / DAQ / Power / HV 1/5/12 • Attach modules 1/8/12 • Testing start Sept ‘12
Who and Where • Core • Modules • EoS • DAQ • Shipping Container & Test Stand • Power supplies