ODOT Procurement Office (OPO)

ODOT Procurement Office (OPO). Donnell Fowler Procurement Operations Manager. OPO Billing Rate Process. Current process has resulted in Generally inconsistent rate schedules for a given firm across their contracts with ODOT.

kaia
Download Presentation

ODOT Procurement Office (OPO)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ODOT Procurement Office (OPO) Donnell Fowler Procurement Operations Manager

  2. OPO Billing Rate Process • Current process has resulted in • Generally inconsistent rate schedules for a given firm across their contracts with ODOT. • Significant Consultant and Agency workload to process rate schedule change requests. • Schedules that often don’t correlate to Actual Salary Rates (ASRs). • We need a better way to • Accommodate salary growth over time, • Standardize realistic rate schedules, • WITHOUT significant time investment.

  3. Current Model BR = Billing Rate Schedule ATA/PA1 ATA/PA2 Consultant A BR1 Consultant A BR2 None of these are the same ATA/PA3 ATA/PA4 Consultant A BR3 Consultant A BR4 • A given consultant might have 10 or more different Billing Rate schedules (BR) across all their ODOT contracts. • Each BR is contract unique. • Each BR uses different ASRs and Overhead rates. • Each contract needs to be amended each year for new rates – huge workload impact .

  4. ODOT

  5. Sr Eng Mgr $38.53 Sr Eng Mgr $94.10 Sr Eng Mgr $63.31 Sr Eng Mgr $87.94 Sr Eng Mgr $66.15 Sr Eng Mgr $73.12 Sr Eng Mgr $74.58 Sr Eng Mgr $69.15 SPIN

  6. Sr Eng Mgr $38.53 Sr Eng Mgr $94.10 Sr Eng Mgr $63.31 Sr Eng Mgr $87.94 Sr Eng Mgr $66.15 Sr Eng Mgr $73.12 Sr Eng Mgr $74.58 Sr Eng Mgr $69.15 SPIN

  7. Sr Eng Mgr $38.53 Sr Eng Mgr $94.10 Sr Eng Mgr $63.31 Sr Eng Mgr $87.94 Sr Eng Mgr $66.15 Sr Eng Mgr $73.12 Sr Eng Mgr $74.58 Sr Eng Mgr $69.15 SPIN

  8. Sr Eng Mgr $38.53 Sr Eng Mgr $94.10 Sr Eng Mgr $63.31 Sr Eng Mgr $87.94 Sr Eng Mgr $66.15 Sr Eng Mgr $73.12 Sr Eng Mgr $74.58 Sr Eng Mgr $69.15 SPIN

  9. Proposed Model ATA/PA1 Consultant A Master Multi-year Schedule ATA/PA2 ATA/PA3 ATA/PA4 • Schedule based on ASRs by classification. • Escalation built-in to the Master Schedule.

  10. New OPO Billing Rate Strategy • Process will standardize to ONE Master Schedule per Consultant (based on ASRs) that most of their ODOT contracts will reference. • NTEs will still apply if new rates are adopted. • Master Schedules will build-in annual escalation. • Average Rates per Classification will be utilized for budget (SES) preparation. • Some exceptions will be allowed when specific staff are anticipated to work a project. • Desired outcomes • Consultant and Agency staff time minimized. • Improved rate consistency. • More realistic rates to support estimating.

  11. FAQs • On Master Schedules, do I include the whole firm? • NO, just use names, classifications and current ASRs for staff anticipated to be used on ODOT contracts. • We are developing a central data base to store these schedules to be referenced in ATAs, PAs and Contracts. • How do I change staff on a project? Is an Amendment required? • Changes to project staff (other than Key Personnel or changes that alter class. averages) require courtesy notification to the Agency. • Staff changes should generally be at or below the Classification Maximum ASR. • Other changes that alter classifications or class. averages will be reviewed annually or as required.

  12. FAQs • Do I have to estimate with the average classification rate on all projects? • Estimating with the average will be the general practice, however Agency may authorize contract exceptions for use of ASRs for specific staff. • Do I invoice the average rate or the actual rate? • For T&M contracts you will always invoice ASRs. The average classification rates will be used to develop the NTE.

  13. FAQs • What about Overhead Rate updates? • We are further developing this strategy; we are looking to incorporate OH changes as they are approved. • Working w/stakeholders, including FHWA. • How do I get started? • We have started this process on a few pilot contracts to get the bugs worked out. • We have a queue of rate change requests that we’ll apply the process to. • We will send out the required forms as we process the actions referenced above.

  14. Next Steps • Refine approach with input from industry and other stakeholders • ACEC/OPO Procurement & Contract Standing Committee • On select upcoming projects, collaborate with the Consultants involved • Contacts • Mike Jenkins • michael.l.jenkins@odot.state.or.us, 503-986-2717 • Vic Folk • victor.folk@odot.state.or.us, 503-986-2709

More Related