An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UC Santa Barbara Multi-Site Solar Photovoltaic Installation Jordan Sager Energy Manager, UCSB Facilities Management CHESC – Jun28, 2016

  2. UCSB Campus Utility Costs FY15

  3. Sat. Sun.

  4. Rooftop Sites – Sites 1, 2System Layouts

  5. Rooftop Sites – Sites 1, 2Dual-Tilt Ballasted Racking System Example

  6. Garage Sites – Sites 3, 4, 5System Layouts

  7. Parking Garage Sites – Sites 3, 4, 5Pre-Fabricated Truss Racking System Example

  8. Parking Garage Sites – Sites 3, 4, 5Pre-Fabricated Truss Racking System Example

  9. Surface Parking Site – Site 6System Layout

  10. Surface Parking Site – Site 6Pre-Fabricated Canopy Racking System Example

  11. Surface Parking Site – Site 6Pre-Fabricated Canopy Racking System Example

  12. Power Purchase Agreement (PPA) Solicitation: • RFP issued by UCSB Procurement Office (March 2015) • job walk (March 2015) • technical and price proposals received (April 2015) and reviewed • project award (May 2015)and start contract negotiation • contract execution (November 2015)

  13. PPA Award: • SunPower identified as apparent awardee based on best value (Cost per Quality Point) analysis • Determining variables: • module efficiency • aggregate system capacity • quality of proposed racking/structural components • monitoring and maintenance plan • company financial strength • experience with SCE Rule 21 Non-Export interconnections • experience on UC campuses

  14. PPA Negotiation and Terms: • 20 year contract term • $.1175/kilowatt-hour • 0% contract escalator • five-year extension option: ₵7.0/kilowatt-hour • production guarantee: 97% of predicted • up-front PM, peer review, inspection costs built into rate

  15. Sat. Sun.

  16. Thurs. Fri. Sat. Sun. Mon. Tues. Weds.

  17. Thurs. Fri. Sat. Sun. Mon. Tues. Weds.

  18. Summary: • 12% campus annual electrical usage offset • avoided cost: $.147/kWh • year 1 cost savings: $270k • 20-yr net savings: $14.5 million