1 / 30

Dejan Trbojevic

Muon acceleration by RLA using non-scaling FFAG. Dejan Trbojevic. RLA for Muons. Introduction: Present design of the muon RLA’s Problems: Matching of the circular non-scaling FFAG to the straight linac. Time of flight adjustments for each pass. Goals:

jtyrrell
Download Presentation

Dejan Trbojevic

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muon acceleration by RLA using non-scaling FFAG Dejan Trbojevic Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  2. RLA for Muons • Introduction: • Present design of the muon RLA’s • Problems: • Matching of the circular non-scaling FFAG to the straight linac. • Time of flight adjustments for each pass. • Goals: • Try to make four or five times in muon energy by either a race track or dog-bone acceleration with a single arc (2.5-10 GeV or 10-40 GeV). • Match the betatron and dispersion functions from the arc to the linac. • Design a chicane to adjust the time of flight for different energy passes. Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  3. Few references for Mike Craddock: D. Trbojevic E.D. Courant, and A. Garren, September 30, 1999, Montauk, Long Island High Energy Muon Collider Workshop Lee Teng: 1956 Non-scaling FFAG proposal at the conference A year later a book Conference Proceedings came out: D. Trbojevic, E.D. Courant, and A. Garren, “FFAG lattice without opposite bends” , AIP Conf. Proc. August 17, 2000 -- Volume 530, pp. 333-338 Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  4. ‘Racetrack’ vs ‘Dogbone’ RLA (both m+ and m- species ) m+ m- m- m+ m+ m- m- m- m- m+ m+ m+ m+ m- m- m+ DE/2 From Alex Bogacz presentation at the previous LEMC: • better orbit separation at linac’s end ~ energy difference between consecutive passes (2DE) • allows both charges to traverse the Linac in the same direction (more uniform focusing profile • the droplets can be reduced in size according to the required energy • both charge signs can be made to follow a Figure-8 path (suppression of depolarization effects) Chuck Ankenbrandt DE Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  5. FODO vs Triplet focusing - ‘flat focusing' linac profile* Bob Palmer* From Alex Bogacz presentation at the previous LEMC: Triplet 1-pass, 3-5 GeV 256.82 meters phase adv. drops much faster in the horizontal plane Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  6. Design of the arcs – from the densely populated FODO cells for the 2.5 -> 10 GeV muons N=142 cells L=1.9 m LBD=0.9 m LQF=0.6 m For the: dp/p=+-60% BBD=1.64 T BQF =-1.09 T GF=20.8 T/m GD=-10.2 T/m r=42.94 m 85.9 m Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  7. Arc cells for two different lattices 1.9 m x max=69 mm 0.9 m 0.3 m x min= -34 mm FODO cell for the dp/p=+-60 % -> 2.5 - 10 GeV Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  8. Arc cells for two different lattices FODO cell for the dp/p=+-60 % -> 2.5 - 10 GeV Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  9. Matching cell – geometrical constraint - arc to linac The matching cell length is: L=3 * 1.9 m = 5.7 m Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  10. Matching cell to the non-scaling FFAG arcs Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  11. Non scaling FFA arcs with matching cells without linac Orbits from 2.5 – 10 GeV through the matching cells and arcs: Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  12. Non scaling FFA arcs with matching cells without linac Betatron Functions from 2.5 – 10 GeV through the matching cells and arcs: Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  13. Non scaling FFA arcs with matching cells without linac Dispersion from 2.5 – 10 GeV through the matching cells and arcs: Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  14. The linac – Betatron Function dependence on energy Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  15. Matching cell with linac – arc to linac Orbits magnified 100 times From 2.5 GeV- 10GeV Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  16. Multipass Linac - racetrack FFAG Chicane 20 Cavities Chicane Non-scaling FFAG arc Non-scaling FFAG arc Chicane Chicane 20 Cavities Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  17. 20 cells linac Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  18. Multipass Linac with combined function triplets Details of the orbits with Chicanes: Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  19. Path length difference from the arc celldp/p=(0,-80%) Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  20. Path length difference from the arc cell (Ds=0.55m for arc) Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  21. -2q L q Lo Details of the chicane calculations: Lo /L=cos q Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  22. Details of the Chicane CAVITY TRIPLET Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  23. New approach: What do we need to came from a remainder by Yoshimaru Mori yesterday:IEEE Transactions on Nuclear Science, Vol. NS-30, No. 4, August 1983 Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  24. New matching cell Input parameters are: xmaxand xminfrom the arc NS-FFAG pmax, po, and pmin, Dx, bx, by, Unknowns: BD, BF, Ffo, Fdo , andlo rfmax ffo rfo amax fdo amin rfmin lo ffo fdo umax rdmin xmax umin fdo rdo xmin fdo rdmax To be matched to the input parameters of the linac: bx, by, ax,ay Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  25. Matching Cell - @ zero dispersion end amax amin lo rdmin fdmin umax rdo umin fdo rdmax fdmax Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  26. Matching Cell @ entrance w Ffmax rfmax j rfmax Ffo amax amin Ffo- Ffmax rfo Ffo- Ffmax= Fdo- Fdmax Ffmin lo Ffmin- Ffo rfmin Ffmin- Ffo= Fdmin- Fdo umax pmin umin xmax umax=amax+lo tan(Ffo-Ffmax) po xmin umin=amin+lo tan(Ffmin-Ffo) pmax Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  27. Mike Craddock’s approach: D/2 rfmax xd+=0 ffo rfo Xd+ xd-=0 fdo Xd- rfmin lo ffo fdo umax rdmin xfp+ umin fdo high p+ rdo xfp- fdo po rdmax F/2 low p- Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  28. p>pcent orbits matched to linac -> zero dispersion for each momentum p=pmax p=pcent Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  29. orbits almost matched to linac -> zero dispersion for each momentum 10 GeV 2.5 GeV Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

  30. Conclusions: • It looks like a combination of the non-scaling FFAG with linac is possible this could reduce present number of arcs. • Multiple pass linac by the triplet combined function dipoles cells. • Time of flight adjustments is necessary due to 0.6 m delay for the lowest energy pass through the arc. A details of chicane design has to be studied. • Initial matching between the two arcs and linac could be improved. • The simulation of acceleration with many particles is already set-up by the PTC (Polymorphic Tracking Code). • Thanks to Muon Inc. for the support Dejan Trbojevic FFAG’08 Workshop, Manchester, 15:00, September 2, 2008

More Related