1 / 10

F ront end H ybrid I ndustrial T ester

F ront end H ybrid I ndustrial T ester. UCL Louvain (L. Bonnet, V. Lemaître, X. Rouby) vincent. lemaitre@fynu.ucl.ac.be. In collaboration with RWTH Aachen (M. Axer, F. Beissel, T. Franke, J. Mnich) IRES Strasbourg (JD. Berst, P. Graehling, P.Juillot, C. Maazouzi).

jory
Download Presentation

F ront end H ybrid I ndustrial T ester

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Front end Hybrid Industrial Tester UCL Louvain(L. Bonnet, V. Lemaître, X. Rouby) vincent.lemaitre@fynu.ucl.ac.be In collaboration with RWTH Aachen(M. Axer, F. Beissel, T. Franke, J. Mnich) IRES Strasbourg(JD. Berst, P. Graehling, P.Juillot, C. Maazouzi) http://www.fynu.ucl.ac.be/themes/he/cms/activities/tracker/hybrids.html Vincent Lemaitre tracker week 29.01.03

  2. Current measurements • Comparisons between FHIT & ARC & CMS-like : FHIT does not send triggers while measuring current consumption whereas ARC and CMS-like system do ARC FHIT • This problem is solved : FEH needs more current when triggered

  3. Electrical Test: limits From statistics on FHIT measurements intervals = [m-3s; m+3s] where m is the mean of distribution and s the RMS • These limits can be resized with a multiplicative parameter, common for all limit values (available in configuration file).

  4. Functional Test: limits These are the ARCS parameter All these limits are accessible in the configuration file

  5. FHITS 1.3 New : version 1.3 (updated interface, as asked by industry) • Display the # of good and bad hybrids of the current day • All part-numbers accepted 1663  1674 (new firmware)

  6. Conversion to XML • conversion to XML: direct contact with CERN people to fit to their wishes • C – routine being written in Louvain ; not necessary @ industry • proposed scenario • production and tests @ industry ( logfile creation ) • delivery @ CERN of hybrids and logfiles (on CD-R) • 1 delivery = # FEH + 1 CD (+ copies) • tests @ CERN (with FHIT  logfile creation) • creation of XML files(by running the C – routine) @ CERN • transfer to database

  7. Number of FHIT set-ups

  8. Test procedure S A M T E C S A M T E C N A I S N A I S E R N I E R N I FHIT To be tested Test setup • Industry 1: Naked hybrids (w/o APVs) • Industry 2: Hybrids • Before bonding pitch adapter  LINK to DB (XML) @ Industry @ CERN

  9. Mechanics New mechanics : -Easier to handle -Insure thermal contact (“cooling”) -Probe for test of bias return line Heavy cover with auto-retractile probe Pad on hybrid for test of bias return line Hybrid Fine positioning plugs Cooling contact

  10. Summary • Difference between set-ups for Current Measurement is understood • First estimate of Limits for ET and FT have been evaluate (to be continued) • Most recent release of software distributed (FHITS 1.3) -improved display -all part number included (firmware) • Agreed procedure for loading FHIT data into DB (almost operational) • Proposal for the number of FHIT set up • Test procedure including thermal contact of hybrid and test of bias return line.