Our project aimed to develop a device that evaluates the linearity, centering, and dead band of the NRG Systems #200P Wind Direction Vane. Utilizing a parallel stepper motor and LabView for data handling, our system allows precise measurements at an accuracy of ±0.5% to detect wind direction changes as small as 1.8 degrees. Our robust design is in SolidWorks, and we aim to refine it further while integrating a break beam sensor. This innovative solution enhances wind measurement accuracy for various applications.
E N D
Team Bi-directional“Our Wind vane spins both ways.” -Keith Beland -Christian Brinegar -Justin Marsha
Problem Statement Our problem statement is to create a device that can be used to test the linearity, centering, and dead band of an NRG systems #200P Wind Direction Vane that samples at most every 1.8 degrees within 2 minutes.
Background • Dead band>8 Degrees • Linearity • Centering
Our Solution • For our final design we chose a solution using an parallel stepper motor while incorporating LabView for displaying and handling of the data.
Electrical System .9 Degree/ 400 step Stepper Motor 5V 2A Digital Line Out PC DAQ Wind vane 5V Analog Input Break Beam Sensor Analog Input
LabView System 2. 1. Above shows the LabView block diagram taking a measurement from the wind vane The T/F box represents whether we want channel on or off
Stepper motor (from Anaheim Automation) The inputs are capable of running from either open collector or TTL level logic outputs. The microstepping driver features resolutions from 200 - 1600 steps/revolution, providing smooth rotary operation. Input voltage from 8-35 VDC. Step angle of 1.8° with an accuracy of +/- 5%
Wind Direction Vane Bucket ½” Post “Bucket” Fixed in place to ½” post to hold windvane in place on final product
Rotation System Stepper Motor Pulley O.D. = 3.75” I.D. = .200”
Work Breakdown • Keith • Stepper motor • Solid works design • Physical Assembly • Christian • Physical Assembly • Software • Lab View and others that may be necessary • DAQ • Justin • Web page • Break Beam sensor • Physical design • Software help
Timeline • We have met our goal of full physical design in Solid Works. • The design as of now is robust, but could be simplified. • Our goals to complete are to continue communication and configure break beam sensor.