slide1 l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Georgia Comprehensive Solid Waste Management Act Sets Planning Standards 25% Waste Reduction 10 Year Disposal Assurance PowerPoint Presentation
Download Presentation
Georgia Comprehensive Solid Waste Management Act Sets Planning Standards 25% Waste Reduction 10 Year Disposal Assurance

Loading in 2 Seconds...

play fullscreen
1 / 12

Georgia Comprehensive Solid Waste Management Act Sets Planning Standards 25% Waste Reduction 10 Year Disposal Assurance - PowerPoint PPT Presentation


  • 315 Views
  • Uploaded on

Georgia Comprehensive Solid Waste Management Act Sets Planning Standards 25% Waste Reduction 10 Year Disposal Assurance DCA Sets Minimum Planning Standards Disaster Plans Plan Consistency. Hall Co. Comprehensive Solid Waste Management Plan. The Plan deals with the following elements:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Georgia Comprehensive Solid Waste Management Act Sets Planning Standards 25% Waste Reduction 10 Year Disposal Assurance' - johana


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Georgia Comprehensive Solid Waste Management Act

Sets Planning Standards

  • 25% Waste Reduction
  • 10 Year Disposal Assurance

DCA Sets Minimum Planning Standards

  • Disaster Plans
  • Plan Consistency
hall co comprehensive solid waste management plan
Hall Co. Comprehensive Solid Waste Management Plan

The Plan deals with the following elements:

1. Waste Disposal Stream Analysis

2. Waste Reduction

3. Collection

4. Disposal

hall co comprehensive solid waste management plan3
Hall Co. Comprehensive Solid Waste Management Plan

Elements (cont.)

5. Land Limitations

6. Education and Public Involvement

7. Litter Reduction and Beautification

(not required by DCA)

8. Implementation Schedule

hall co comprehensive solid waste management plan4
Hall Co. Comprehensive Solid Waste Management Plan

1. Waste Disposal Stream Analysis

Disposition of Hall County Generated Waste

Candler Road Landfill 67,528 tons 26%

RTS Landfill 88,000 tons 33%

Crystal Creek Landfill 15,600 tons 6%

Exported 91,325 tons 35%

Total 262,453

hall co comprehensive solid waste management plan5
Hall Co. Comprehensive Solid Waste Management Plan

1. Waste Disposal Stream Analysis (cont.)

Waste Generated By Source 2002

Commercial/Industrial 26%

Residential 40%

Construction/Demolition 34%

hall co comprehensive solid waste management plan6
Hall Co. Comprehensive Solid Waste Management Plan

1. Waste Disposal Stream Analysis (cont.)

Per Capita Generation

  • 1993 Plan = 6.41 lbs./day
  • 2004 Plan = 9.34 lbs./day
hall co comprehensive solid waste management plan7
Hall Co. Comprehensive Solid Waste Management Plan

2. Waste Reduction

EnviroShare

Drop Off Recycling

Recycling and Composting Bins Distribution

Study Curbside Recycling-County

Recycling Center Evaluation

hall co comprehensive solid waste management plan8
Hall Co. Comprehensive Solid Waste Management Plan

3. Collection

Review PAYT—Cities/County

Continue Compactor Sites w/Changes

Analysis of Alternatives

hall co comprehensive solid waste management plan9
Hall Co. Comprehensive Solid Waste Management Plan

4. Disposal

  • Continue use of Candler Road Landfill
  • Continue Alternative Daily Cover
  • Examine use of Methane (Allen Creek)
  • Examine Special Mgt. Items/HHW
  • Allen Creek Landfill-Post Closure
hall co comprehensive solid waste management plan10
Hall Co. Comprehensive Solid Waste Management Plan

5. Land Limitations

  • Examine Plan Consistency Issues
  • Examine Need for Local Ordinances
hall co comprehensive solid waste management plan11
Hall Co. Comprehensive Solid Waste Management Plan

6. Education and Public Involvement

  • Support Continued State Grant Funding
  • Hispanic Community Sweeps
  • Corporate Education Program
  • Waste Reduction Education--Residents
hall co comprehensive solid waste management plan12
Hall Co. Comprehensive Solid Waste Management Plan

7. Litter Reduction and Beautification

  • Education of Youths/Adults
  • Increase Participation in KHB Programs
  • Increased Publicity and KHB Volunteers
  • Adopt A Road
  • Community Pride
  • Stream Clean Up Events
  • Additional Volunteers
  • Gainesville Greenways Connector
  • New BHT Sign--Flowery Branch