AMBER Case Study Buffalo Creek, CO 13July1996 Buffalo Creek (1) #1020 13July1996 9.5mi 2 Sand Draw #5050 13July1996 1.5mi 2 Spring Gulch #5051 13July1996 1.0mi 2 Buffalo Creek Z/R Gage WSR-88D estimate was 2.75 inches. Rain gage report was 2.68 inches.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'AMBER Case Study' - johana


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
amber case study

AMBER Case Study

Buffalo Creek, CO

13July1996

buffalo creek z r gage
Buffalo Creek Z/R Gage
  • WSR-88D estimate was 2.75 inches.
  • Rain gage report was 2.68 inches.
  • WSR-88D estimate would be available in real time.
  • Rain gage is located at 234.5o at 76.5km from the Denver WSR-88D.
conclusions
Conclusions
  • Heavy 1 hour burst of rainfall was concentrated over the fire scar.
  • Almost all of the observed ABR went into runoff, due to the state of the ground.
  • The rainfall across the Buffalo Creek watershed was concentrated near the mouth, leading to a rapid sharp rise in the creek.