Server Virtualization: Navy Network Operations Centers. Lucas Taber July 13 th , 2006 University of San Diego GSBA 573 IT Project Management. Introduction. The Navy maintains several Network Operations Centers (NOCs) that are critical to their mission.

Related searches for Server Virtualization: Navy Network Operations Centers

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Server Virtualization: Navy Network Operations Centers' - joelle


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Server virtualization navy network operations centers

Server Virtualization:Navy Network Operations Centers

Lucas Taber

July 13th, 2006

University of San Diego

GSBA 573 IT Project Management


Introduction
Introduction

  • The Navy maintains several Network Operations Centers (NOCs) that are critical to their mission.

  • The NOCs are overwhelmed by the rapid growth of information system:

    • Space

    • Heat

    • Power

  • This project will address this issue through the application of server virtualization technology.


Problem
Problem

  • Navy NOC #1 has reached capacity ahead of schedule.

  • Plant facilities require immediate and expensive upgrades to support additional systems.

  • Modernized systems must be installed to reduce costs and improve capabilities, but existing systems cannot be immediately decommissioned.

  • Operating at capacity is an operational risk to the Navy.


Project objectives
Project Objectives

  • Implement server virtualization technology to reduce the number of physical servers:

    • Eliminate the risk of systems failure

      • Overheating

      • Power Failure

    • Eliminate the cost of interim fixes and schedule delay

      • Keep Projects on Schedule

    • Reduce the cost of future installations.

      • Future Server Deployment

      • Future Facility Upgrades (NOC #2)


Stakeholders
Stakeholders

  • The facilities management team at NOCs 1 and 2.

  • The operations staff.

  • The engineering team.

  • The shore modernization team.

  • The Fleet Readiness Certification Board (FRCB).

  • The security Certification and Accreditation (C&A) team.

  • The Navy Designated Approval Authority (DAA).

  • All Navy Customers.


Project justification
Project Justification

  • Current server utilization is very low.

    • Industry estimate = 5% on average.

    • Additional capacity is wasted and wastes resources.

  • Servers can be consolidated on a 10 to 1 ratio (maximum).

    • Navy estimate = 4 to 1

  • Consolidation can recover as much as 75% of the current facilities resources.

    • Cost Avoidance

    • Risk Reduction


Project requirements
Project Requirements

  • The project must achieve a minimum server consolidation ratio of 2 to 1.

  • Consolidated server hardware resource utilization will not exceed 80%.

  • Navy Designated Approval Authority (DAA) must approve the security certification and accreditation package.

  • Fleet Readiness Certification Board (FRCB) must approve the installation.

  • Consolidation efforts must not degrade the level of service provided by the servers or increase long-term operational risk.

  • Overall maintenance costs must decrease within the following fiscal year.

  • Virtualization technology will only be deployed at the two primary NOCs.

  • No server installations will be performed to achieve the consolidation, only existing server hardware can be used.

  • Additional Storage Area Network (SAN) materials can be procured if cost savings can still be achieved.

  • Planned system downtime will not exceed three hours.


Deliverables
Deliverables

  • Project Management-Related Deliverables

    • Work Breakdown Structure (WBS)

    • Plan of Action and Milestones (POA&M)

    • Project Budget

    • Weekly Activity Reports

    • Bill of Materials

  • Product Related Deliverables

    • Concept of Operations

    • Site Survey Report

    • Test Plan Document

    • Test Plan Results

    • System Security Authorization Agreement (SSAA) Package

    • Installation Guide

    • Training Curriculum

    • Implementation Plan

    • Recommended Standard Operating Procedures (RSOP)

    • System Operation Verification Test (SOVT)

    • Trip Report / Lessons Learned

    • Virtualized Server Systems


Success criteria
Success Criteria

  • Success Criteria

  • The project is completed by February of 2007 (prior to the next scheduled installation).

  • The facilities team for NOC 1 can avoid an emergency facilities upgrade.

  • Operational risk is the same or lower.

  • No additional manpower is required to operate the new software.


Wbs phase 1 concept
WBS: Phase 1 - Concept

  • Concept

    • Hold Kick-Off Meeting

    • Identify Potential Solutions

      • Prepare Analysis of Alternatives

        • Contact Product Vendors

        • Research on the Internet

    • Generate Preliminary Cost Estimate

    • Write Concept of Operations

      • Write Document

      • Perform Document Q & A


Wbs phase 2 development
WBS: Phase 2 - Development

  • Development

    • Engineering

      • Select Software Product and Software Version

      • Select Server Hardware or Identify Existing Resources

      • Perform Site Survey of NOC

      • Identify Server Virtualization Candidates

      • Generate Site Survey Report

        • Write Document

        • Perform Document Q & A

    • Develop Implementation Plan

      • Write Document

      • Perform Document Q & A

      • Review Implementation Plan With Site

      • Obtain Implementation Plan Approval From Site

    • Write Installation Guide

      • Write Document

      • Perform Document Q & A

    • Write Recommended Standard Operating Procedures (RSOP)

      • Write Document

      • Perform Document Q & A

    • Write Systems Operation Verification Test (SOVT)

      • Write Document

      • Perform Document Q & A

  • Lab Testing

    • Download and Assemble Software

    • Write Test Plan

      • Write Document

      • Perform Document Q & A

    • Install Software in Lab

    • Execute Test Plan

    • Produce Test Results and Analysis


Wbs phase 2 development1
WBS: Phase 2 - Development

  • Security

    • Perform independent security evaluation

    • Generate security test results and analysis

    • Write SSAA

      • Write Document

      • Perform Document Q & A

    • Submit SSAA to DAA

    • Obtain Authority To Operate (ATO)

  • Training

    • Develop Training Curriculum

      • Write Document

      • Perform Document Q & A

    • Train Site Operators

  • Obtain FRCB Fielding Approval

    • Generate CASE Form

      • Write Document

      • Perform Document Q & A

  • Procurement

    • Generate Budgetary Cost Estimate

    • Obtain Funding

    • Procure Software and Hardware

    • Receive and Process Software and Hardware

      • Record Products in Configuration Management Database

      • Deliver Software to Installers

      • Ship Hardware to Site.


Wbs phase 3 implementation
WBS: Phase 3 - Implementation

  • Implementation

    • Travel to NOC

    • Perform In-brief with Site

    • Hardware and Software Implementation

      • Measure Existing Resource Utilization

      • Install New Hardware

      • Install Virtualization Software

      • Virtualize Existing Servers and Migrate to New Hardware

      • Monitor Performance

    • Site Acceptance

      • Conduct SOVT

      • Obtain Site Acceptance

    • Perform Out-brief with Site

    • Return Travel


Wbs phase 4 close out
WBS: Phase 4 – Close Out

  • Close-Out

    • Generate Trip Report / Lessons Learned

      • Write Document

      • Perform Document Q & A

    • Transition Program to Operations


Staffing
Staffing

  • Project Manager

  • Lead Engineer

  • Test Engineer

  • Technical Writer

  • Security Analyst

  • Security Tester

  • Trainer

  • Buyer

  • Installer

  • Logistician



Communication management
Communication Management

  • Daily Coordination

    • Email

  • Weekly Progress Monitoring

    • Staff Meeting / Teleconference

    • Weekly Action Report

  • Project Details / Requirements

    • Formalized Documentation (e.g., CONOPS, Test Plan, SOVT).


Risk management
Risk Management

  • The project will use a risk register to monitor risk areas and apply mitigation strategies.


Expected benefits
Expected Benefits

Short-term benefits

Long-term benefits


Expected costs
Expected Costs

Short-term Costs

Long-term Costs


Summary
Summary

  • An rapid deployment of server virtualization technology will provide significant benefit to the Navy.

    • Cost Avoidance: Present and Future

    • Risk Reduction

    • Increased Capacity