Group 14671. Expansion Joint Active Monitoring. Team Members. Joe Savino – Project Lead Mechanical Engineer Adam Remick – Customer Contact Electrical Engineer Andrew Hintermeier – Scribe Mechanical Engineer. Problem Statement.

1 / 13

Download Presentation

Group 14671

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Group 14671 Expansion Joint Active Monitoring

  2. Team Members • Joe Savino – Project Lead Mechanical Engineer • Adam Remick – Customer Contact Electrical Engineer • Andrew Hintermeier – Scribe Mechanical Engineer

  3. Problem Statement An expansion joint (EJ) connects pipes together in large systems to allow for the settling of a system. Garlock makes many styles of EJs to fit different size pipes and to hold up against different environmental factors. The current version is used in systems without any detection of imminent failure besides visual inspection. Many EJ’s are in hard to reach places and data acquisition is needed to monitor their status. The goal of this project is to create a sensor package that can monitor the integrity of an EJ it is installed in and recognize possible failure situations. An EJ with the installed sensor package should be able to withstand a prescribed amount of thermal, pressure, and mechanical cycles. The installed sensor package should be implemented with no significant loss to the integrity of the EJ.

  4. Expansion Joints • Bolted between pipes • Made of Rubber, Fabric and Metals • Diameters of 2’’ to 130’’ • Subjected to: • Multiple working fluids, • Pressures, Temperatures • Contraction, Expansion • Torsion, Vibration

  5. Prior Project – P13671 • Test Rig for Garlock Expansion Joints • Has ability to test/measure both temperature and displacement cycles • Garlock has ability to also test pressure at their facilities

  6. Benchmarking • No system in the market • Difficult to measure composite/rubber degradation • Multiple reasons for degradation • Current method is regular preventative maintenance • Visual Inspection • Qualitative data no quantitative data

  7. Our Goal Deliverables • Sensor package for EJ’s 4in and larger • Be able to predict impending EJ failure Stretch Goals: • Wireless Transmission of Data (based of previous MSD project) • Mountable on any type of EJ

  8. Customer Requirements • Monitor losses in integrity • Withstand working environment • Easy data access • Applicable to many sizes and types • Compatible with existing hardware • Alterations must not significantly affect the strength of the EJ • Mountable on an EJ

  9. Engineering Requirements

  10. House of Quality

  11. Stakeholders Wayne Evans -Garlock Representative and project customer Dr. Jason Kolodziej - RIT customer and guide RIT

  12. Project Schedule (near future) • Functional Decomposition • Tour of Garlock • Concept Development and Brainstorming • System Design

  13. Questions?