1 / 3

Lester McKee Sources Pathways and Loadings Workgroup May 14 th 2008

San Francisco Estuary Institute. Item #2c. Small Tributaries Loadings Study #2: Zone 4 Line A, Cabot Blvd. Hayward Year 3 – Proposed Analyses. Lester McKee Sources Pathways and Loadings Workgroup May 14 th 2008. Item #2c. San Francisco Estuary Institute. Option A Status Quo. $76,963.

jin
Download Presentation

Lester McKee Sources Pathways and Loadings Workgroup May 14 th 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. San Francisco Estuary Institute Item #2c Small Tributaries Loadings Study #2: Zone 4 Line A, Cabot Blvd. HaywardYear 3 – Proposed Analyses Lester McKee Sources Pathways and Loadings Workgroup May 14th 2008

  2. Item #2c San Francisco Estuary Institute Option A Status Quo $76,963

  3. Item #2c San Francisco Estuary Institute Option B Dioxin and Perfluorinated (Reduce TMs and MeHg) $76,636

More Related