Introduction of Emissions Trading to Ireland

Introduction of Emissions Trading to Ireland. Dr. Ken Macken Programme Manager Emissions Trading Unit Joint Committee CMNR 29 June 2005. Kyoto Protocol.

jin
Download Presentation

Introduction of Emissions Trading to Ireland

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction of Emissions Trading to Ireland Dr. Ken Macken Programme Manager Emissions Trading Unit Joint Committee CMNR 29 June 2005

  2. Kyoto Protocol • The Kyoto Protocol is an international agreement reached under the auspices of the UN (The UNFCCC – United Nations Framework Convention on Climate Change). The Protocol entered into force in February 2005. • There are currently six Greenhouse Gases recognised by the UNFCCC: • Carbon dioxide (CO2) - 66% as CO2 equivalents in 2003 • Methane (CH4 ) - 19% as CO2 equivalents in 2003 • Nitrous oxide (N2O) - 14% as CO2 equivalents in 2003 • Hydrofluorocarbons (HFCs) • Perfluorocarbons (PFCs) • Sulphur hexafluoride (SF6) • Under this Protocol, the EU has committed itself to reducing its greenhouse gases emissions by 8% from 1990 levels during the first Kyoto commitment period from 2008 to 2012. • Under a “Burden Sharing Agreement” in the EU, Ireland was permitted an increase of 13% on 1990 levels of emission.

  3. Current position • Current position: Total emissions of GHG are around 67.5 Mt/a (2003) • Target (1990 +13%): Our target for total emissions is 61 Mt/a (average for 2008-12) • Reduction required: Around 6.5 Mt/a reduction on our current position

  4. Mechanisms for Cost Effective Reductions • Project Mechanisms • Joint Implementation (JI) – from 2008 • Clean Developoment Mechanism (CDM) – from 2005 • Emissions Trading • Emissions trading started on 1st. January 2005 and covers the 25 Member States of the enlarged European Union. • The EU scheme is the first multi-national emissions trading scheme in the world • Phase one is the pilot period running from 1January 2005 to 1 January 2008. • Phase two is the first Kyoto period (2008-2012) when the EU scheme becomes part of the world wide UNFCCC scheme and extends to all Annex 1 countries. • Applies to CO2 only!!! (and not to any of the other five greenhouse gases). • Standard “Cap and Trade” scheme (though it will be the largest one in the world!). • Allowances are to be based on a NationalAllocation Plan. • At least 95% of allowances must be issued free of charge in Phase 1 (at least 90% in Phase 2). • Penalties have been set at €40/t for the Pilot Phase (€100/t for Phase 2) plus a roll-overpenalty in the following year.

  5. Ireland • Structure • National Allocation Advisory Group to advise EPA • It comprises the Chief Executives (or senior nominees) from Forfas, CER, SEI and NTMA under an independent chairman. • The Director General of EPA is also a member. • Government decides total amount for Emissions Trading • EPA allocates this amount to sectors and installations • Method • Following extensive consultation, and on the advice of NAAG, EPA draws up a National Allocation Plan describing the basis for, and the actual allocations of, Greenhouse Gas Allowances (equivalent to an emission of 1 tonne of carbon dioxide) to each site coming within the scheme • The National Allocation Plan must receive approval from the EU Commission • Each site must obtain a GHG Permit from EPA in order to continue to operate • The Permit requires operators to record emissions and to submit allowances to cover each year’s operation

  6. Process for First National Allocation Plan • July 2003 • Government assigned responsibilities to EPA – retained overall amount • Established National Allocation Advisory Group • Autumn 2003 • Consultants appointed by DEHLG and also by EPA • Two consultation workshops held • February 2004 • First public consultation on draft NAP • 31 March 2004 • Submit NAP to Commission • 7 July 2004 • Commission approval for Ireland’s NAP • Summer 2004 • Baseline verification underway • September 2004 • Second public consultation on NAP

  7. Route to Final Allocations (Oct ‘04 – Mar ‘05) • Submissions reviewed by EPA and NAAG • Changes proposed to annual division of New Entrant set-aside • Non-EPA issues forwarded to Government • Finalised National Allocation Methodology forwarded to Commission – approval received dated 20/01/05. • Employed external consultant to advise on capacity issues in Cement&Lime sector • Sent National Allocation Methodology and Provisional Allocation Decision to all participants on 22/02/05 – one week to respond • EPA Board gives final consideration to remaining matters – Final Allocation Decision agreed 8 March 2005 and notified to participants and Commission.

  8. Summary of Allocation Methodology • Pilot Phase allocation 66.96 Mt/3years (22.32 Mt/a) • This represents an estimated 97% of expected emissions (BAU). • At least 97% to be initially allocated free to installations permitted by 31/03/04. • Allocations at sector level first • Based on average historic emissions in 2002 and 2003 adjusted for National Energy Policy • Subsequently allocations to installations within each sector. • Based on average historic emissions in 2002 and 2003 or, where this is < 90% of the average of the emissions in the highest three years of 2000-2003, the average of the highest three years of 2000-2003 will be used. • Different basis for recently commenced installations. • Allocations for Known Planned Developments (KPDs) come from the relevant sector allocation • New Entrants to get 1 Mt free allocation for the three year period. • Also a CHP set aside (taken from the powergen sector) of nearly 0.5 Mt. • Auction of ~0.5 Mt to cover costs of operating the scheme. • No further allocations to installations deemed to have closed.

  9. Final Allocation Decision – 8 March 2005

  10. National Emissions & Target

  11. Second National Allocation Plan (2008-12) • Deadline for Submission to EU 30th June 2006 • Final allocation decision to be taken by 31 December 2006 • Legal differences between NAP1 and NAP2 • Auction can be up to 10% of total allowances • No opt-outs • MS can (subject to Commission approval) opt-in any sectors and any of the other five GHGs • Limit to be set on use of JI/CDM under transposition of Linking Directive • Government to decide “Total” assigned to Emissions Trading • EPA to decide allocations to individual installations (and sectors) • Government may or may not give direction on set asides, closures etc. as before.

  12. National Registry • Create allowances and Kyoto units • Track ownership • Track compliance with obligation to surrender • Track Member State’s obligations under the Protocol • The Registry is not a trading platform

  13. National Registry (cont’d) • Software: • Built by DEFRA • 10 other countries using this system • State of art hosting environment • CITL is live: Denmark, Sweden, Finland, Netherlands, UK, Germany, France • Ireland passed all testing with CITL • Testing internal procedures and conducting audit • “Go-Live” in the coming weeks • All queries on registry to: etradmin@epa.ie