An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report on Progress of ISSI Architectures (PSAWG/06-070) T. Hengeveld, PSAWG Chair Denver, CO, June 2006

  2. Status vs San Diago Schedule

  3. Supplementary Data Architecture • Architecture Completed on Schedule • Draft Complete Late, but is now available for Review in ISSI TG (subject to today’s votes) • M&P Completion Date of 20-Aug won’t happen • Motion Requested: That document number PSAWG/06-035-R4 be forwarded through STG and APIC to the ISSI TG for the development of messages and procedures and such modifications to the architecture section as may be required.

  4. Console ISSI Architecture • Architecture Completed on Schedule • M&P Draft available for Formulating TG (CITG?) today subject to vote • Motion Requested: That document number PSAWG/06-046-R3 be forwarded through STG and APIC to the CITG for the development of messages and procedures and such modifications to the architecture section as may be required.

  5. Conventional ISSI Architecture • Architecture Draft 2-weeks Late • Comment period closed without comments, but … • M/A-COM Intends to Comment • Does anyone else intend to comment? • Planned completion (architecture) approx. 30-Aug

  6. Packet Data/ OTAR • EADS/Nortel Networks Proposal • Mobile IPv4 Based Architecture, IP tunnelled to the Home RFSS • Architecture Draft Delivered on (revised) Schedule • Comment Period now Closed, Comment resolution to begin • Motorola, Lucent and M/A-COM have commented on EADS proposal • Motorola has presented slides on radically different architecture • SNDCP tunnelled to the Home RFSS • EADS and Lucent have commented on Motorola presentation • See working meetings report

  7. Summary • Supplementary Data is behind schedule, but should be completed this year. • ISSI Support for the Console I/F, which is also (by agreement in San Diago) the Console I/F, is on schedule and should be completed this year. • ISSI Conventional Support doesn’t seem to be generating a whole lot of interest, and is slightly behind schedule. May be able to be completed this year. • Packet Data/OTAR support is well behind schedule (through no fault of the editors), due, the chair believes, to a lack of concensus on the overall approach, and is at risk of not being completed this year.