John A. D’Angelo US Federal Highway Administration CUPGA 2008 Saskatoon, Saskatchewan PowerPoint Presentation
Download Presentation
John A. D’Angelo US Federal Highway Administration CUPGA 2008 Saskatoon, Saskatchewan

Loading in 2 Seconds...

play fullscreen
1 / 39

John A. D’Angelo US Federal Highway Administration CUPGA 2008 Saskatoon, Saskatchewan - PowerPoint PPT Presentation


  • 103 Views
  • Uploaded on

John A. D’Angelo US Federal Highway Administration CUPGA 2008 Saskatoon, Saskatchewan . How Many WMA Technologies are Available in the U.S.?. How Many WMA Technologies are Available in the U.S.?. Currently 12 Technologies Actively Marketed and Available in the U.S.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'John A. D’Angelo US Federal Highway Administration CUPGA 2008 Saskatoon, Saskatchewan' - jersey


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

John A. D’Angelo

US Federal Highway Administration

CUPGA 2008

Saskatoon, Saskatchewan

slide3

How Many WMA Technologies are Available in the U.S.?

Currently 12 Technologies Actively Marketed and Available in the U.S.

there is a tremendous growth in interest in warm mix in the us
There is a tremendous growth in interest in Warm Mix in the US
  • WHY?
    • Fuel costs are up.
    • Bitumen cost have spiked.
economic drivers for using rap
Economic Drivers for Using RAP
  • Growth in recycling occurs when it is economical to do so.
  • Warm Mix Technology can improve RAP workability.
a review of some projects and what we have learned
A review of some projects and what we have learned
  • Hall Street St. Louis
  • I70 Colorado
  • Entrance to Yellowstone
st louis paving schedule
St. Louis Paving Schedule
  • Control (12.5mm PG 70-22) – 5/17/06
  • Sasobit – 5/18/06
  • Sasobit – 5/19/06
  • Evotherm – 5/22/06
  • Evotherm – 5/23/06
  • Aspha-Min – 5/25/06
interstate 70 dillon co
Interstate 70, Dillon, CO

70 miles West of Denver, CO

Elevation 8,800 – 11,100 Feet

Dillon

slide17

Interstate 70, Dillon, CO

* Minimum delivery temp for control HMA was 280 °F

Chart is Courtesy of CODOT

construction highlights
Construction Highlights

* Average of other control mix tested on the job.

Regardless of Hamburg Rut Depth, Moisture damage more prevalent in the WMA samples than the control samples – see following pictures

conclusions
Conclusions
  • WMA decreased voids in lab compaction
  • WMA field compaction comparable at lower temps
  • Hamburg moisture damage visibly more in WMA
  • Early WMA performance equal to HMA on the job
    • No rutting, no early distresses
  • Confident that WMA facilitates cold temp. placement
  • Will use more WMA in this corridor if performance is comparable to HMA
yellowstone hamburg
Yellowstone Hamburg
  • Control - 3.82 mm and 4.00 mm
  • Advera - 3.80 mm and 3.25 mm
  • Sasobit - 3.28 mm and 2.60 mm

*All the testing was performed at 40°C wet and reported at 20,000 passes.

flh what have we learned
FLH-What Have We Learned
  • Field density achieved in all cases
  • Saved ≈ 20% in fuel at the plant
  • Temperature at plant hard to regulate
  • Mix handled similarly
  • Workers noted no handling difficulties
  • No smoke
  • Additives don’t seem to affect mix design
  • Sasobit stiffens binder
objective

Binder Characterization

Objective
  • Evaluate the effects of three Warm Mix process namely Sasobit, Aspha-Min and Evotherm on M320-Table 2 Performance Grade
  • To Compare the Performance Grades of Warm Mix processes with the base asphalt used in preparing warm mix asphalts
findings
Findings
  • Sasobit – increase of one high temp. PG grade
  • Aspha-Min - no effect on PG grade
  • Evotherm
    • recovered at BASF, no effect on the PG grade
    • recovered from the stored emulsion, reduced by one high temp. PG grade
cost example
Cost Example
  • Fuel usage
    • 2.12 gallons/ton of mix -- Control
    • 1.62 gallons/ton of mix -- Advera
    • 1.80 gallons/ton of mix -- Sasobit
  • • 20 to 25 % fuel savings ≈ $1/ton of mix
  • • Cost for Advera ≈ $3.30/ton of mix
  • • Cost for Sasobit ≈ $2.30/ton of mix
      • Cost occurred in August 2007
wma technical working group twg
WMA Technical Working Group (TWG)
  • Formed in 2005
  • Purpose:
    • Promote Technology Transfer
    • Facilitate Product Approval Methods
    • Encourage Research
    • Develop Quality and Environmental Testing Protocols
    • Provide Guidelines for Mix Design and Construction
    • Identify Other Benefits of WMA
wma twg accomplishments
WMA TWG Accomplishments
  • www.warmmixasphalt.com
  • Material Testing Framework
  • Emission Testing Framework
  • WMA Best Practices Document
  • Research Needs Identified
    • Developed three (3) research statements
    • Submitted through AASHTO to NCHRP
      • All projects highly ranked by SCOR
      • Total $1.4 million
nchrp research projects
NCHRP Research Projects
  • NCHRP Project 09-43
    • “Mix Design Practices for Warm Mix Asphalt”
    • $500,000.00
    • Advanced Asphalt Technologies, LLC
  • NCHRP Project 09-47
    • “Engineering Properties, Emissions, and Field Performance”
    • $900,000.00
    • Principal Investigator: Asphalt Institute

WMA SCAN 2007

34

warm mix asphalt best practices
Warm Mix Asphalt: Best Practices
  • Quality Improvement Series (QIP) 125
    • Stockpile Moisture Management
    • Burner Adjustments and Efficiency
    • Aggregate Drying and Baghouse Temperatures
    • Drum Slope and Flighting
    • Combustion Air
    • RAP usage
    • Placement Changes

35

wma us implementation
WMA US Implementation
  • To date trial projects have been place in over 50% of the US states.
  • The oldest projects are now 3 to 4 years old with no indication of poor performance.
  • Over 500,000 tons of WMA have been placed.
  • Two states want to use WMA as a alternative to Hot Mix now.
wma us implementation1
WMA US Implementation
  • Major concerns
    • Potential for moisture damage.
    • Long term durability.
    • Mix design changes.
thank you

Thank You

Questions