1 / 19

Historic overview

Historic overview. Egmond: Kick off Plymouth: CSI table Utrecht: Introduction frame of reference Santander: Recasting CSIs into the frame of reference. 3. Intervention procedure. 4. Evaluation procedure. Indicators Parameters Monitoring Measurement Modelling System knowledge. IBCSI.

jered
Download Presentation

Historic overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Historic overview • Egmond: Kick off • Plymouth: CSI table • Utrecht: Introduction frame of reference • Santander: Recasting CSIs into the frame of reference

  2. 3. Intervention procedure 4. Evaluation procedure • Indicators • Parameters • Monitoring • Measurement • Modelling • System knowledge IBCSI Strategic objective Defined Not defined Momentary coastline Intertidal Coastline Operational objective Defined Beach width Exceedance curves 1. Quantitative state concept 2. Benchmarking procedure Not defined X Reference state Current state

  3. Overview Dutch presentations • Arno (RIKZ): Introduction • Aart (UU): Scientific results and CSIs • highwater line and beachwidth • storm Egmond • Stefan (WL): Scientific results and CSIs • multiyear evolution of nourished beach (beach width) • video derived observations of longshore currents • Troels (UCo): Scientific results • Arno (RIKZ): Recasting scientific results into the frame of reference

  4. 3. Intervention procedure 4. Evaluation procedure • Indicators • Parameters • Monitoring • Measurement • Modelling • System knowledge IBCSI Strategic objective Defined Not defined Momentary coastline Intertidal Coastline Operational objective Defined Beach width Exceedance curves 1. Quantitative state concept 2. Benchmarking procedure Not defined X Reference state Current state

  5. Example: Dynamic Preservation • Strategic objective: “Sustainable preservation of functions and values in the coastal zone” • Structural erosion no longer acceptable • Operational objective: “Maintain the coastline at its 1990 position”

  6. 1. Quantitative State Concept

  7. 2. Benchmarking procedure

  8. 3. Intervention procedure

  9. “Maintaining the coastline at its 1990 position” 1. Momentary CoastLine (MCL) 3. Nourishment 4. Evaluation procedure • System knowledge • State indicators • JARKUS Frame of reference: Dynamic Preservation Not OK? “Sustainable preservation of functions and values” OK? 2. Benchmarking procedure BCL TCL

  10. Video Array y = -130 m Survey Array y = -1500 m Video-based quantification of the MCL(Subtidal Beach Mapper, Aarninkhof 2003)

  11. Working with the Intertidal coastline • Strategic objective: • sustainable preservation of functions and values • Operational objective: • maintain the coastline at its 1990 position • QSC: • location of the coastline based on the intertidal beach volume - MICL • Benchmarking procedure: • Reference:10 year regression of MICLs to find the 1990 coastline - BICL • Test:10 year regression of MICLs to find the year T coastline - TICL • Intervention procedure: • IF the TICL exceeds the BICL THEN nourish • Evaluation procedure: • Coastline will be maintained at its 1990 position • Maybe the existing procedure is represented but ARGUS data not effectively used NAP+3m (Dunefoot) NAP-5m MCL MICL

  12. MCL & MICL (m) Time (months) Egmond MCL (surv.) and MICL (vid.) – Raw data MCL (survey) MCL & MICL (m) MICL (video) Time (months) Egmond MCL (surv.) and MICL (vid.) – Normalized data

  13. Working with the high water line • Strategic objective: • guarantuee sustainable safety of beach property • Operational objective: • build no property seaward of the line with a 5% exceedance probability • QSC: • probability curves of the high water line • Benchmarking procedure: • Reference: location of the 5% exceedance line • Test: exceedance percentage of desired location • Intervention procedure: • IF percentage of desired location is too high THEN relocate • Evaluation procedure: • No property built at locations with exceedance probabilities higher than 5% • Long term developments unknown(system timescale & policy timescale)

  14. Location of the exceedence curves of the high-tide levels 2001 14-09-2001 9 GMT

  15. Working with beach width • Strategic objective: • guarantuee sustainable recreation on the beach • Operational objective: • maintain a minimal beach width for bathing people • QSC: • width of inter tidal and supra tidal beach (waterlines) • Benchmarking procedure: • Reference: minimal beach width (to be defined by the end user - municipalities) • Test: actual beach width as measured by ARGUS • Intervention procedure: • IF actual beachwidth smaller than reference beach width THEN nourish • Evaluation procedure: • Beach width maintained constant throughout the season • Nourishments during wintertime could be inefficient

  16. a b c d Width of the inter-tidal & supra-tidal beach Inter-tidal beach Mean width = 80 m beach width (m) Y = -250m beach width (m) Y = -500m beach width (m) Y = -750m tidal range (m) Time: 2001-2002

  17. a b c d Supra-tidal beach Mean width = 50-60 m beach width (m) Y = -250m beach width (m) Y = -500m beach width (m) Y = -750m tidal range (m) Time: 2001-2002

  18. This presentation was brought to you by:Arno de KruifStefan AarninkhofAart KroonTroels AagaardSusanne QuartelMark van KoningsveldDiscussion

More Related