Roundabouts at Three IntersectionsAugust, 2012 ENGINEERING DEPARTMENT General Project Description: Design three Roundabouts at (Edgemere & RC Poe, Edgemere & Rich Beem and Montwood & Sun Fire) and one Traffic Signal at Dyer & Angora Loop, improvements to include concrete sidewalks / ADA Ramps, landscaping, irrigation system and illumination. Project Schedule: Design Start: November 07, 2011 Target Design Completion: October / 2012 Projected Bid Opening: TBD Projected Construction Start Date: TBD Design Status: The project is on the Preliminary Design phase and the due date is August 24, 2012. Pending Issues: Street ROW acquisition at Edgemere & RC Poe, required to improve the Roundabout design. Design Cost: $ 170,389.25 Current Construction Cost Estimate: TBD Total: TBD Project Contacts Project Manager Design Consultant Construction Contractor Lupe Salinas 541-4200 Huitt-Zollars, Inc. TBD Page 1 of 1