ALDRC HEAD GATE FINISHED VIEW

Minimum of 4” pertrusion of ditch side wall in front of Bulkaid. ALDRC HEAD GATE FINISHED VIEW. 48” Bulkaid width. 6” pertrusion of Bulkaid from ground level. Bottom of Culvert level with Ditch floor. of 4. ALDRC HEAD GATE CUTAWAY VIEW LOOKING DOWNSTREAM.

Download Presentation

ALDRC HEAD GATE FINISHED VIEW

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Minimum of 4” pertrusion of ditch side wall in front of Bulkaid. ALDRC HEAD GATE FINISHED VIEW 48” Bulkaid width 6” pertrusion of Bulkaid from ground level. Bottom of Culvert level with Ditch floor. of 4

  2. ALDRC HEAD GATE CUTAWAY VIEW LOOKING DOWNSTREAM 6” Support Bolts for Gates over 48”. 2” 4” 6” from top of Bulkaid to ground level. Waterman C-10 Gate Concrete Bulkaid 10” Steel Culvert, sloped ~ 1” per foot. Caulk & Seal Headgate to Culvert with Sealant and Bolts. Secondaryditch 10” Steel Culvert. Bottom of Culvert level with Ditch floor. Bulkaid extends 6” below ditch floor. 12 inches. Fill under culvert with 6” of concrete and let cure before pouring Bulkaid. of 4

  3. ALDRC HEAD GATE BULKAID SPECIFICATIONS VIEW Minimum of 4” pertrusion of ditch side wall in front of Bulkaid. 48” 5 1/2” 6” from top edge to ground level. Minimum 48”. May have to be greater if ditch is deeper to insure proper culvert level, 6” pertrusion above ditch ground level and 6” below Ditch floor. #5 REBAR 10” 6” Ditch floor. Ditch floor. Bottom of Culvert level with Ditch floor. 6” below ditch floor. of 4

  4. 12” wide trench 48” Wide cut ALDRC HEAD GATE DITCH DIGGING SPECIFICATIONS Minimum 36” Height cut to accomodate 6” above Ditch top ground level and 6” below Ditch floor for a 48” Bulkaid height. NOTE: Trench length no shorter than 6’ to insure ditch integrity. Refilled on top of culvert with original and compacted dirt. 10’ trench length considered ideal, and land owner can ditch from there. Minimum 10” Deep cut to accomodate 5 1/2” thick Bulkaid and 4” ditch wall in front of Bulkaid. 10” Steel Culvert. Ditch floor level 6” below Ditch floor level Ditch floor level Fill under culvert with 6” of concrete and let cure before pouring Bulkaid. of 4