MANG INASAL PHILIPPINES INCORPORATED MAINTENANCE SECTION/DEPARTMENT. PROPOSAL FOR THE CREATION OF ADDITIONAL SECTION OR DEPARTMENT. SECTION COMPOSITION. SECTION HEAD – 1 SECTION OFFICER – 1 PERSONNEL FOR MANILA, NORTH LUZON, SOUTH LUZON, VISAYAS, MINDANAO AREA,

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'MANG INASAL PHILIPPINES INCORPORATED MAINTENANCE SECTION/DEPARTMENT' - jatin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
mang inasal philippines incorporated maintenance section department

MANG INASAL PHILIPPINES INCORPORATEDMAINTENANCE SECTION/DEPARTMENT

PROPOSAL FOR THE CREATION OF ADDITIONAL SECTION OR DEPARTMENT

section composition
SECTION COMPOSITION
  • SECTION HEAD – 1
  • SECTION OFFICER – 1 PERSONNEL FOR MANILA, NORTH LUZON, SOUTH LUZON, VISAYAS, MINDANAO AREA,
  • MAINTENANCE Staff – AT LEAST 2 PERSONNEL PER AREA
qualification
QUALIFICATION
  • SECTION Head
  • Engineering Graduate;
  • At least 5 years experience in Managerial or Supervisory level for Maintenance, Engineering and construction works;
  • 30 to 35 years of age.
  • SECTION Officer
  • Engineering Graduate with at least 2 years experience in supervisory level for maintenance, engineering and construction works;
  • 30 to 40 years of age.
  • Maintenance Staff
  • - Must be at least college level,
  • - 24 to 40 years of age,
  • - Minimum of 2 years experience in electro-mechanical, and plumbing works.
communication system
COMMUNICATION SYSTEM
  • 1. Every area will be given a periodic preventive maintenance schedules;
  • 2. Reports for maintenance concerns will be course through by Store Manager, Management trainee and Area Manger to Section Officer assigned in each area and then will be replied through e-mail, fax or hard copy document, for the schedule of work, materials needed and name of person to do the task;
  • 3. A monthly reports will be submitted each store branches for their record and reference;
  • 4. Section Officer and Maintenance Staff will be reporting on a daily, weekly and monthly basis to Section Head;
scope of work
SCOPE OF WORK
  • 1. Electrical works;
  • 2. Air-con and condensing units cleaning;
  • 3. Repair of equipment;
  • 4. De-clogging of sewer and waste line;
  • 5. Exhaust duct checking;
  • 6. Replace busted fluorescent tube of signage except pylon signage;
  • 7. Repair of doors, broken tiles, locker, baffle filter and roll-up door;
  • 8. Monitor and record utilities consumption;
  • 9. LPG line leak testing
  • NOTE: If franchised Store will request for the service of Maintenance staff, charge will be based on a daily rate of personnel that will do the task and overtime will be compensated accordingly.
tools and equipment
TOOLS AND EQUIPMENT
  • 1. Digital multi-tester or clamp ammeter;
  • 2. Portable welding machine;
  • 3. Portable Pressure washer;
  • 4. Close and open wrenches set;
  • 5. Portable Auger machine;
  • 6. Manual de-clogging equipment;
  • 7. 6 and 12 feet aluminum ladder
  • NOTE : Revolving cash fund will be needed for emergency repair purposes and Motorcycle for quick response.