UPA Package 5, Module 2. Urban Profile. The Urban Profile. is the first step of Situative Planning a pproach used as a starting point for understanding a community situation a focussed analysis to document the basic fact s of the investigated area. Scope of Information.
E N D
UPA Package 5, Module 2 Urban Profile
The Urban Profile is • the first step of Situative Planning approach • used as a starting point for understanding a community situation • a focussed analysis to document the basic facts of the investigated area
Scope of Information • Physical environment and infrastructure • Environmental condition • Demography and social infrastructure • Institutional setting (including attitute, perceptions and beliefs) • Economic setting • Historical overview
How to Gather the Information • Look for already existing written documents or data collected • Collect new information • By interviewing key informants • By visiting the place • By drawing maps • By taking photographs • By observation • By sharing some hours of daily life
How to Present the Information • Give a narrative summary • Include maps • Prepare diagramms and tables • Add some photos
Study Arrangement and Time Schedule • Make sure how much time is available • Always mind the budget
Way to Patan Sketch of Shankhamul, W#10, KMC Bagmati River Bridge Proposed Bagmati Corridor Road Settlements Existing Gravel Road Way to Baneshor