1 / 6

Friday

Friday. 8h20: Beam back. Injection set-up for 4 x 2e10 per beam. Ramp to 3.5 TeV . Squeeze to 2m. 12h58: Stable beams, double intensity, new record luminosity: > 3e28 cm -2 s -1 in all IR’s . Lumi scans. 23h41: Beams dumped. RF cavity tripped due to quench.

jam
Download Presentation

Friday

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Friday • 8h20: Beam back. Injection set-up for 4 x 2e10 per beam. Ramp to 3.5 TeV.Squeeze to 2m. • 12h58: Stable beams, double intensity, new record luminosity: > 3e28 cm-2 s-1 in all IR’s. Lumi scans. • 23h41: Beams dumped. • RF cavity tripped due to quench. • RF piquet called for recovery. Cryo back rapidly, but checking in detail. • 2h20: Fully back, including resynchronization. • 2h20: Recovery and injection setup: 4 x 2e10. • 6h03: Start of ramp for stable beams. • 6h27: Both beams dumped with interlock from BPM at P6. • Orbit excursion happened 10 min earlier and beam was dumped when setup beam flag went false (masks unmasked). LHC planning

  2. Double Intensity and Luminosity LHC planning

  3. Luminosity History LHC planning

  4. RF cavity quench LHC planning

  5. Loss of last ramp Beam Dump(mask removed) Orbit ExcursionInterlock Not caused by orbit feedback. Reason to be analyzed. OK at time of dump. LHC planning

  6. Ahead NOW (advance by 5 hours) LHC planning

More Related