1 / 4

Details

Details. #2907 Thurs 19 th April Shift 2 #2908 Thurs 19 th April Shift 3 Used FEL-like set-up from most recent FEL shift #2900 60 pC BC = -14/+12 LC phased for minimal energy spread post linac EMMA LeCroy Scope used Triggered from INJ-BPM-02 signal

jalen
Download Presentation

Details

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Details • #2907 Thurs 19th April Shift 2 • #2908 Thurs 19th April Shift 3 • Used FEL-like set-up from most recent FEL shift #2900 • 60 pC • BC = -14/+12 • LC phased for minimal energy spread post linac • EMMA LeCroy Scope used • Triggered from INJ-BPM-02 signal • Measured TOF on AR2-BPM-01 and ST1-BPM-01 TOF 2 Trigger TOF 1

  2. #2907 AR2-BPM-01 • Energy acceptance of post-linac beam (range over which saw signal on PID and AR2-BPM-01) was roughly 30 mm on AR1-1 (D = 80 cm), i.e. 3.75 % • Attenuator on TOF BPM connection (fastened strongly to scope). B = AR2-BPM-1 two peaks separated by ~ 120 pS A = INJ-BPM-01 Mean(B) – Mean(A) (pS) energy deviation of beam (fraction)

  3. ST1-BPM-01 • It’s ¾ stripline, not ¼ as we thought. No “zero crossing” feature • Same two peak structure seen the in TOF, though less pronounced

  4. #2908 AR2-BPM-01 • Removed attenuator (pair of scissors!) “two state” TOF (macro-jitter) even more pronounced since measurement of micro-jitter much sharped (gaussians narrower)

More Related