connectder product overview mwcog beeac meeting 7 17 14 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14 PowerPoint Presentation
Download Presentation
ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

Loading in 2 Seconds...

play fullscreen
1 / 9

ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14 - PowerPoint PPT Presentation


  • 182 Views
  • Uploaded on

ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14. A Home Goes Solar Every 4 Minutes. Wiring Can Be Complicated. Equipment + Labor = $800 5% of cost. The Connect DER ( x DER ). “Plug-and-play” solar via meter case Integration and revenue models for utilities

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
    Presentation Transcript
    1. ConnectDER Product Overview MWCOG – BEEAC Meeting 7/17/14

    2. A Home Goes Solar Every 4 Minutes

    3. Wiring Can Be Complicated Equipment + Labor = $800 5% of cost

    4. The ConnectDER (xDER) “Plug-and-play” solar via meter case Integration and revenue models for utilities Key installation costs eliminated

    5. Power grid Solar panels cellular wifi zigbee AMI Cloud Reporting & controls Inverter ConnectDER API Home

    6. Hardware Connector Metering Circuit Breaker

    7. Software Metering Connection Status

    8. MEA Game Changer 2.0 Project • Install xDER on 10 MD homes; Demonstrate positive user experience and cost savings from technology • Team of Infinite, Standard Solar, Bill Brooks (Solar and NEC code expert), PEPCO • Schedule • May-July: Prep, training, scheduling • August-September: installation, reporting • Oct 2014 – Sep 2015: performance tracking and reporting

    9. Contact Whitman Fulton CEO 202-207-6882 wfulton@infiniteinvention.com