An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GATSIBO DISTRICT NYAGATARE TANZANIYA GICUMBI KAYONZA RWAMAGANA

  2. GATSIBO DISTRICT ACHIEVEMENTS ACTIVITIES IN LAST 3 YEARS Gatsibo , on the 09/12/2012

  3. GATSIBO DISTRICT IS COMPOSED OF THE FOLLOWING: • POPULATION : 433,997 • HOUSEHOLDS : 96,327 • SURFACE AREA : 1585,3 Km2 • SECTORS : 14 • CELLS : 69 • VILLAGES : 603

  4. ACHIEVEMENTS The population are the way of means of living basically depend on Agriculture i.e Crop production and Live stock farming.

  5. PILLAR I: Economic development

  6. 1.1 REVENUES COLLECTED In terms of revenue collections, in2012-2013 we shall endevour to maximise collecting taxes from all taxable sources.

  7. 1.2.3. LAND CONSOLIDATION

  8. 1.2.4 MECHANIZATION: Mechanization center has been established in the District and so far 457ha was ploughed using tractors. As result, individual farmers have acquired their own tractor and 4 power tillant.

  9. PRODUCTION

  10. FERTILIZERS

  11. DRYING GROUND

  12. 1.3. LIVESTOCK:

  13. NUMBER OF LIVESTOCK 2010-2011

  14. 10/05/2012

  15. LIVESTOCK PRODUCTION:

  16. Kibondo- MCC

  17. FISH FINGERLING Kiriba dam

  18. GIRINKA PROGRAM: Abahawe inka

  19. GIRINKA PROGRAM

  20. Indogobe zahawe akarere ka Gatsibo

  21. Indogobe z’akarere

  22. COOPERATIVES

  23. Status of Umurenge SACCO NB: 14 SACCOs TO BE CONSTRUCTED IN 2012-2013

  24. B.K OPENED 2 BLANCHES (NGARAMA AND KABARORE)

  25. INFRASTRUCTURES

  26. Ngarama modern market

  27. 100M FOOT-BRIDGE CONSTRUCTED IN NYAGIHANGA SECTOR

  28. ROADS The district has feeder roads networks with distance of 365km and out of that, 110km are in good state whereas 255km need rehabilitation.

  29. 54km of feeder roads; Bukomane-Kageyo-Gikoma rehabilitated

  30. WATER In the District we have 567.5 km of water pipelines and out of that 189 km are operational.

  31. INDUSTRIES Rice Plant Cassava Plant

  32. ACCESS TO ELECTRICITY Out of 84,572 households, 8,976 have access to hydro-electricity power leading to an increase from 2.5% in 2006 to 10.6% in 2012 109 households have constructed the biogas digesters 154 Households have acquired solar energy panels

  33. Linea elettrical Muhura-Bugarura by EWSA

  34. Solar energy

  35. BIO-GAZ

  36. Land use • Out 84,572 households, 61113 households are under community settlement( Imidugudu) • Master plans for Kabarore and Kiramuruzi towns have been completed as well as master plan for Development of Muhazi lack Shores. • Systematic land registration has been completed in all 14 sectors and land owners in four sectors have been issued with land titles.

  37. PILLAR II: Social development

  38. 2.1. HEALTH The District have got 2 hospitals since 2006,14 health centers in 2006 but we have 19 health centers in 2012, 2006 wasn’t health post but now 10 health post are available with 2,412 health community workers which implies that each administrative village have got 4 health community workers and 1 District pharmacy.

  39. SOME HEALTH INDICATORS IN SERIES OF YEARS AS INDICATED BELOW:

  40. Muhire Narcic umwe mu bagabo baboneje urubyaro

  41. 2.2. EDUCATION 2.2.1. PRIMARY EDUCATION:

  42. 2.2.2. SECONDRY EDUCATION:

  43. 2.2.3. TVET SCHOOLS: 2.2.3.1. VTCs: Vocation Training Centers (Post - Primary)

  44. 2.2.3.2 .TVET ( Technical Schools):

  45. In respect to promotion of Technical –know- how,in Gatsibo District, 2 TVET are operational and other 2 model TVET are soon to be completed in Gatsibo and Remera Sectors, 4 TVET schools will be operational by January 2013.