Logo Attributed to 2003 Solar Car Team PowerPoint Presentation
Download Presentation
Logo Attributed to 2003 Solar Car Team

Loading in 2 Seconds...

play fullscreen
1 / 19

Logo Attributed to 2003 Solar Car Team - PowerPoint PPT Presentation


  • 258 Views
  • Uploaded on

Logo Attributed to 2003 Solar Car Team Third Update Presentation Critical Function Prototype (CFP) Presenters: Dan Oakeson Paulo Botero Introduction Schedule Budget Critical Functioning Prototype Conclusion Schedule Steering Controls Seat Brakes Steering Due date was Oct 30

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Logo Attributed to 2003 Solar Car Team' - jacob


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
logo attributed to 2003 solar car team
Logo Attributed to 2003 Solar Car Team

Third Update Presentation

Critical Function Prototype (CFP)

Presenters:

Dan Oakeson

Paulo Botero

introduction
Introduction
  • Schedule
  • Budget
  • Critical Functioning Prototype
  • Conclusion
schedule
Schedule
  • Steering
  • Controls
  • Seat
  • Brakes
steering
Steering
  • Due date was Oct 30
  • New due date is Nov 17

Mounts

Rack and Pinion

Source:

University of Utah Solar Vehicle

controls
Controls
  • Due date is Dec 1

Throttle

On/Off Switch

Source:

University of Utah Solar Vehicle

slide6
Seat
  • Original due date was Oct 30
  • The new due date is Nov 17

Seat

Source:

University of Utah Solar Vehicle

brakes
Brakes
  • Date to be completed was Oct 30
  • New due date is Nov 17

Caliper

Rotor

Source:

University of Utah Solar Vehicle

budget
Budget
  • Rack and Pinion
  • Shell Latches
  • Hardware/Materials
  • Donation from ATK Launch Systems Group - $3000
  • Projected Funds $5550
critical function prototype
Critical Function Prototype
  • Describe CFP
  • What We Learned
  • Failures
critical function prototype10
Critical Function Prototype
  • Two Choices

- Rack and pinion steering system

- Brake system

brake system
Brake System
  • Components

- Master cylinders

- Brake calipers

- Rotors and pads

- Nylon brake lines

Source:

University of Utah Solar Vehicle

needed changes
Needed Changes
  • Re-orient Master Cylinder
  • Re-design Brake Pedal Pivot Point

Source:

University of Utah Solar vehicle

improved brake system
Improved Brake System
  • New Pivot Point

Source:

University of Utah Solar vehicle

improved brake system14
Improved Brake System
  • New Mounting Bracket

Source:

University of Utah Solar Vehicle

what we ve learned
What We’ve Learned
  • Clamping Force
  • Mechanical Ratio
  • Coefficient of Friction
  • Brake Lines

Source:

University of Utah Solar Vehicle

failures
Failures
  • Time Constraints
  • Master Cylinder Leaking
  • Brake Calipers Leaking
conclusion
Conclusion
  • Schedule
  • Budget
  • CFP
question and answer
Question and Answer

Presenters:

Paulo Botero Boteromontoya@hotmail.com

Dan Oakeson dan.oakeson@gmail.com

Faculty Advisor:

Dr. Eberhard Bamberg bamberg@mech.utah.edu

slide19
David Anderson dma5@utah.edu

Paulo Botero boteromontoya@hotmail.com

Clint Bushman chbushman@hotmail.com

Jonathan Evans jre5@utah.edu

Richard Goetz rickygoetz@juno.com

Ryan Jameson dinkyrdj@yahoo.com

Ben Miller mccuenn@hotmail.com

Dan Oakeson dan.oakeson@gmail.com

Kelty Wakeley keltywakeley@hotmail.com

James Watson anzianowatson@hotmail.com