Supplier Treasure Hunt Results

Supplier Treasure Hunt Results. Hosted by: Johnson Controls INC – Livermore, CA Trim Masters INC – Modesto, CA DATES: Nov 16 - 17. Participants. Rick Kalisz – JCI Livermore Glen Kerrigan – Amtex INC Fred Zaske – JCI Livermore Shayne Bozarth – TMI Modesto Bob Higle – TMI Modesto

ivor-hale
Download Presentation

Supplier Treasure Hunt Results

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supplier Treasure Hunt Results Hosted by: Johnson Controls INC – Livermore, CA Trim Masters INC – Modesto, CA DATES: Nov 16 - 17

  2. Participants Rick Kalisz – JCI Livermore Glen Kerrigan – Amtex INC Fred Zaske – JCI Livermore Shayne Bozarth – TMI Modesto Bob Higle – TMI Modesto Eddie Lucas – TMI Modesto Dan Powers – TMI Modesto Joe Mossinger – TEMA Miguel Alvarez – JCI Livermore Irene Cheng – TEMA Verulo Campos – Amtex INC Chris Bozzo – JCI Livermore Scott Showman – TEMA Bill Brownlow – KHMCA Stanley Jackson – KHMCA Marco Montalvo – TEMA Thomas Tuzinowski – JCI Livermore Edward Guzman – TEMA JR Ibarra – TEMA

  3. Where did we look? • Johnson Controls INC • Foam Processing • Trim Assembly • Seat assembly area • Over Head Console / Supermarket Area • Trim Masters INC • SK4 Seat Assembly Area • MIG Welding Robots / Resistance Spot Welding • Vibe Seat Assembly • MIG Welding Robots / CNC pipe benders • Plastic Processing Area • Injection Molding / Plastic Assembly Equipment

  4. Top 3 Kaizens What did we find? • Foam Line Start-up Procedure • Fix Compressed Air Leaks • Light Sensors by Sky Lights • Total Estimated Energy Savings (All Projects) ~ 216,728 KWh/yr • Total Cost Savings (All Projects) ~ $25,162/Yr • Estimated Implementation cost ~ $9,815 • Estimated CO2 Emission Savings ~ 59 Metric Tons

  5. Summary Report

  6. Top 3 Kaizens What did we find? • Replace all Metal Halide lights with HID • Injection Molding Start-up with fewer pumps • Wayne Trail bender on during Non-Production • Delayed start on Cooling Tower • Total Estimated Energy Savings (All Projects) ~ 778,252 KWh/yr • Total Cost Savings (All Projects) ~ $84,051 / Yr • Estimated Implementation cost ~ $57,712 • Estimated CO2 Emission Savings ~ 214 Metric Tons

  7. Summary Report

  8. Questions/Comments Thank you!