Development of a system prototype for control of industrial loads and dispersed electrical power plants on a distribution electrical grid. Basic data about the project. Participants:. INEA d.o.o . , control and managment of industrial processes
E N D
Development of a system prototype for control of industrial loads and dispersed electrical power plants on a distribution electrical grid
Basic data about the project Participants: • INEA d.o.o. , control and managment of industrial processes • Elektro Ljubljana d.d., electrical distributor, supplier • Količevo Karton d.o.o., paper plant • Koto d.o.o., waste processing plant • Livar d.d., foundry • PapirnicaVevčed.o.o., paper plant • EIMV, electric power research institute • Faculty of Electrical Engineering 2
Basic data about the project • IJS , Slovenian scientific research institute • VBG d.o.o., creative design center Project lifetime From 21.1.2009 until 22.1.2010 Financing The part of the project is financed by European Union and Slovenian Technology Agency. 3
Site server – KIBERsik, KIBERbox Effects Product Overview Peak electricity reduction from 8% to 30% ( 13% on average) Cost reduction on electric power from 5% to 25% of electricity costs Optimal management of production and energy processes Increase of the internal security of energy supply Peak demand levelling system by load shedding Optimal management of local energy sources Optimal time scheduling of high energy consuming processes Power consumption and electric loads control 5
KIBERnet Complete Solutions KIBERnet users • TSO • DSO • Supplier • Aggregator • Consumer • Producer • Prosumer Virtual Power Plant System 6