  • 79 Views
  • Uploaded on

Ramshorn pond dam rehabilitation Public information session. May 14, 2014. PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer. OUTLINE. Additional Evaluations Proposed Design Approach Additional Design Considerations. Additional evaluations.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Ramshorn pond dam rehabilitation Public information session' - isaura


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
ramshorn pond dam rehabilitation public information session
Ramshorn pond damrehabilitationPublic information session

May 14, 2014

PARE CORPORATION, FOXBORO, MA

Allen R. Orsi, P.E., Managing Engineer

outline
OUTLINE
  • Additional Evaluations
  • Proposed Design Approach
  • Additional Design Considerations
additional evaluations
Additional evaluations
  • Upstream Membrane Option
additional evaluations1
Additional evaluations
  • Upstream Membrane Option
additional evaluations2
Additional evaluations
  • Toe Drain Impacts
    • Reviewed improvements provided by downstream toe drain
    • Existing Seepage Exit Gradient Factor of Safety = 1.2
    • With Toe Drain Exit Gradient Factor of Safety = 2.0
    • Dam safety practice designs for a Factor of Safety = 5.0
additional evaluations3
Additional evaluations
  • Opinions of Cost
    • Significant cost impacts associated with contingencies and early stage of design
additional evaluations4
Additional evaluations
  • Recommended Approach
    • Upstream Cutoff Wall
      • Durability
      • Permittability
      • Schedule
      • Drawdowns
design approach
Design approach
  • Proposed Site Plan
design approach1
Design approach
  • Proposed Spillway
design approach2
Design approach
  • Proposed Low Level Outlet
design approach3
Design approach
  • Proposed Upstream Wall
design approach4
Design approach
  • Proposed Parking
design approach5
Design approach
  • Proposed Public Access
design approach6
Design approach
  • Proposed Drainage
additional design considerations
Additional design considerations
  • Control of Water
    • Drawdowns
    • Bypass / Flow Maintenance
    • Cofferdams
  • Construction Phasing
  • Detours / Road Closure
  • Public Access Information / Signage