1 / 8

Unit 2, Day 5

Unit 2, Day 5. Slingshot Design. Agenda. Homework Slingshot Design Slingshot Building (if you are approved!). Homework. DUE MONDAY : SLC Online Action Plan If not finished on Monday, MANDATORY reflection hour at 1:00PM Monday until finished. (Parents will have to wait)

isanne
Download Presentation

Unit 2, Day 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Unit 2, Day 5 Slingshot Design

  2. Agenda • Homework • Slingshot Design • Slingshot Building (if you are approved!)

  3. Homework • DUE MONDAY: SLC Online Action Plan • If not finished on Monday, MANDATORY reflection hour at 1:00PM Monday until finished. (Parents will have to wait) • DUE TODAY/MONDAY/TUESDAY: Slingshot Designs • Slingshot designs must be approved to start building

  4. Slingshot Designs • Materials will be passed around; take a look • You are NOT allowed to begin building untilEVERY group member’s designs are approved! • If absent Mon/Tue, you are NOT excused from this work. • You hold up your entire group if you do not turn it in. • Take a picture of it and text/email it to me BEFORE class. • Failure to turn it in on Mon/Tue = ZERO

  5. Slingshot Designs • Each group member must use the ENTIRE BOXto draw a design of your slingshot from a DIFFERENT angle: • Top view, Front view, Side view

  6. Slingshot Designs • You may ONLY build the slingshot from these available materials: • Four feet of surgical tubing • Two yards of duct tape • Half of a Wiffle ball • Two 6-inch dowel rods

  7. Slingshot Designs • You must also indicate how you plan to DECORATE the slingshot: • Draw any patterns you will use • Label the colors you want to have

  8. Homework • DUE MONDAY: SLC Online Action Plan • If not finished on Monday, MANDATORY reflection hour at 1:00PM Monday until finished. (Parents will have to wait) • DUE TODAY/MONDAY/TUESDAY: Slingshot Designs • Slingshot designs must be approved to start building

More Related