Current Telemetry Dashboards

Current Telemetry Dashboards. NDSWG September 15, 2009. QSE Telemetry (as of 08/12/09). TDSP Telemetry (as of 08/31/09). Load Observability (as of 09/02/09). State Estimator Daily Convergence Rates: August 2009. http://nodal.ercot.com 5.

iman
Download Presentation

Current Telemetry Dashboards

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Current Telemetry Dashboards NDSWG September 15, 2009 http://nodal.ercot.com 1

  2. QSE Telemetry (as of 08/12/09) http://nodal.ercot.com 2

  3. TDSP Telemetry (as of 08/31/09) http://nodal.ercot.com 3

  4. Load Observability (as of 09/02/09) http://nodal.ercot.com 4

  5. State Estimator Daily Convergence Rates: August 2009 http://nodal.ercot.com 5

  6. State Estimator Monthly Convergence Rates: Jun 2009 – Aug 2009 http://nodal.ercot.com 6

  7. FIT III, Week 12 – State Estimator http://nodal.ercot.com 7 Key Numbers and Issues: 95% Test Average Convergence 92% or higher for 21 of 27 Test Hours 100% for 18 of 27 Test Hours The majority of issues that arose during the test were attributable to zonal-nodal mismatches as well as missing nodal telemetry. Shift Engineers logged over 30 manual replacements throughout the test to address unit telemetry not yet mapped in nodal systems. This issue resulted in two noticeable drops in convergence during the test: • The first drop occurred on July 28, when Hour Ending (HE) 1100 converged at 79%. • The second drop occurred on July 29, when HE 1100 converged at 69%.

  8. FIT III, Week 13 – State Estimator http://nodal.ercot.com 8 Key Numbers and Issues: 96% Test Average Convergence; 92% or higher for 22 of 27 Test Hours; 100% for 19 of 27 Test Hours The majority of issues that arose during the test were attributable to zonal-nodal mismatches as well as unit telemetry missing in nodal. On Day One, convergence dipped to 69% during Hour Ending (HE) 1500 owing telemetry missing from two ICCP links that dropped during MP site-to-site failover. On Day Two, convergence started at 69% (HE 0900) as manual replacements were made to address telemetry issues that were accumulated during non-Business Hours immediately prior to testing. A nodal database load was performed during HE 1500.

  9. FIT III, Week 14 – State Estimator FIT III Assessment reports will be posted at: http://nodal.ercot.com/readiness/eds3/documents/index.html Key Numbers and Issues: 96% Test Average Convergence; 92% or higher for 24 of 27 Test Hours; 100% for 21 of 27 Test Hours The majority of issues that arose during the test were attributable to zonal-nodal mismatches as well as unit telemetry missing in nodal. On Day One, convergence dipped to 77% during Hour Ending (HE) 1400 owing to failed ICCP links. On Day Two, convergence dipped to 83% during HE 1600 and to 64% during HE 1700 owing to zonal-nodal mismatches and missing nodal telemetry. The final FIT III Week 14 report is scheduled to post to the Readiness Center on Sept. 8. http://nodal.ercot.com 9

  10. FIT Update: Convergence Trends – FIT II & FIT III * One hour was removed from the Week 7 test results to accommodate a nodal database load. 10 10/11/2014 LFC

  11. Appendix: Telemetry & State EstimatorOverview of Reports, Processes, and Data http://nodal.ercot.com 11

  12. ICCP • Telemetry Support • Telemetry Reporting • State Estimator Tuning • New Telemetry Point Addition Process • Telemetry Issue Process • Current Telemetry Status • Telemetry Status Whereabouts http://nodal.ercot.com 12

  13. Telemetry Support • ERCOT Full Time Staff ICCP Support • Advanced Network Applications Support 2 Engineers • Control Room 1 Operations Analyst & 1 Shift Engineer • IT 2 System Analysts • Additional Staff on a part time basis • Market Participants • Contact for Nodal Issues • Timely Response on detected issues http://nodal.ercot.com 13

  14. Telemetry Dashboards • The following Telemetry Dashboards are being posted on the Readiness Center: • Observability • QSER & TDSP Telemetry • The link for these dashboards is: http://nodal.ercot.com/readiness/eds1/documents/index.html • These dashboards are currently being posted monthly following each mid-month Nodal database update. • Report questions can be sent to EDS2@ercot.com FIT II & FIT III Assessment reports are posted at: http://nodal.ercot.com/readiness/eds3/documents/index.html http://nodal.ercot.com 14

  15. Telemetry Dashboards Telemetry Dashboards } http://nodal.ercot.com 15

  16. Telemetry Reporting – QSER/TDSP Dashboard QSER & TDSP Dashboard Questions may be sent to: eds2@ercot.com http://nodal.ercot.com 16

  17. Telemetry Reporting – Observability Dashboard If a number other then 0 is in column B, then there is missing telemetry which requires Market Participant Corrective Action. Questions may be sent to: EDS2@ercot.com http://nodal.ercot.com 17

  18. Telemetry Reporting State Estimator (SE) Convergence • Advanced Network Applications provides analysis assistance and can be reached at the EDS2 email: EDS2@ercot.com http://nodal.ercot.com 18

  19. State Estimator Tuning • FIT • Monitors Telemetry • Compares Generation between Zonal & Nodal • ICCP Support Team • Analysis Support of FIT Issues • ICCP Issue Resolution Support • Produce FIT Report http://nodal.ercot.com 19

  20. FIT Telemetry Reporting FIT Report • Log of Events & Observations • The daily logs published in the bi-weekly FIT Reports provide a window into the types of issues that affect convergence during FIT testing hours. • FIT Reports are posted at:http://nodal.ercot.com/readiness/eds3/documents/index.html Questions can be sent to EDS2@ercot.com http://nodal.ercot.com 20

  21. New Telemetry Point Addition Process 21 10/11/2014 LFC

  22. Current Telemetry Issue Process http://nodal.ercot.com 22