An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operational Issues for Rail ProjectsAPTA Legal Affairs Seminar 2008 Janie Sheng K&L Gates LLP janie.sheng@klgates.com (202) 778-9855

  2. Shared Use • What type of share? • Shared Corridor • Shared Track

  3. (cont’d) • Shared Corridor: • no major freight vs. passenger capacity issues • lower insurance cost • don’t have to use FRA-compliant equipment

  4. (cont’d) • Shared Track • Must use FRA-compliant equipment • i.e. vehicles that meet FRA safety and crashworthiness requirements for use on the general railroad system. See 49 CFR 238. • Otherwise, secure a waiver from FRA requirements for use of non-compliant vehicles.

  5. (cont’d) • FRA essentially requires temporal separation as part of the operation plan in Shared Track situations.

  6. Rail Line Capacity • Besides price, the most important issue for freight railroads is capacity on the line. • Capacity constraints are worse in dense urban freight corridors.

  7. (cont’d) • Tension between how many passenger trains public agency wants to run vs. how many trains freight railroads need to run. • Commission a capacity analysis. • Freight railroads will want to preserve the right to run additional freight.

  8. (cont’d) • Public agencies need to make sure freight railroads don’t have the right for future expansion and use up passenger rail capacity.

  9. Operations and Maintenance • Will you be purchasing the railroad right-of-way? • If NOT, then • Freight railroads may want to drive your passenger trains. • On-time performance issues. • Freight railroads may want to perform maintenance of way. • Public agency can still perform maintenance on passenger equipment.

  10. (cont’d) • If purchasing railroad right-of-way and track • More likely that public agency will be able to drive own trains and maintain own property.

  11. Liability and Insurance • “But for” liability protection. • Freight railroads want public agencies to indemnify them against any and all claims • Arising from grant of access, or • Provision of passenger rail service • Regardless of negligence • That would not have arisen but for the existence of the passenger rail service.

  12. (cont’d) • Public agencies should expect “but for” liability even if purchasing right-of-way.

  13. (cont’d) • How do public agencies manage the risk? • Insurance • Usually self-insurance + policies • Huge cost item for public agencies

  14. (cont’d) • Amtrak Reform and Accountability Act • Federal statute limits rail passenger liability to $200 million per occurrence. • Clearly applies to Amtrak • Appears to apply to commuter rail • Unclear whether it applies to third party claims

  15. (cont’d) • The industry has talked about establishing a Captive Insurance Pool with other passenger rail providers for lower premiums.

  16. The End.