This proposal outlines a 48-hour floating MD plan scheduled from Monday, July 9, to Wednesday, July 11. Key activities include beam dump physics fills, ATS MD for pre-squeeze and very low beta, 25ns injection tests, Q20 setup, and high pile-up studies with standard optics. The schedule prioritizes transitioning to Q26 injection and conducting beta* leveling tests. The floating MD will conclude on July 11. This plan may be revised as the floating MD for the following week is canceled.
E N D
Proposal Floating MD for 48h(preliminary) • MON09/7 • 16:00 Beam Dump physics fill (need to come from high energy) • 18:00 ATS MD: Pre-squeeze and very low beta ATS (0.1 m) • TUE 10/7 • 07:00 Beam dump • 08:00 25ns injection tests • 13:00 Q20 set up • 17:00 High pile-up (~100): standard optics & 2b of 3e11 (Q20); collisions IR1&5 ; noise excitation, transverse offset etc • WED 11/7 • 03:00 Dump & ramp down; revert to Q26 injection • 04:00 Beta* leveling test up to 36b • 16:00 End of floating MD. • Cancel floating MD in the week after.