An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Inventory Planning, Control& Valuation

  2. What is an Inventory ? Inventory • the stock of any item or resource used in an organization: raw materials, finished products, component parts, supplies and work-in-process. An inventory system • policies and controls for monitoring levels of inventory • Information system that records transactions and enables analysis of stock requirements and levels/quantities, costs etc

  3. Why hold inventory / stock? • Provide flexibility • minimum delay in supplying customers • a good range • Protect against uncertainties • Enable economic purchasing • Anticipate changes in demand or supply • Buffers to feed processes and enable efficient scheduling • Strategic stock holdings

  4. Inventory Types • Raw-materials. • Work-in-progress or in-transit • Finished-goods • In the warehouse, awaiting shipment, in delivery vehicles, in tanks, on shelves, in the stores • Strategic inventory • Scrap & re-work

  5. The Nature of Inventory Planning • Inventory do not give revenues without operations. • Organizations resources are limited there for investments in inventory should be optimized ( Economic ). • Why to manage inventory ? To ensure a continues operation activities (non-stop).

  6. Costs of Inventory • Ordering costs • Offering prices,purchase order & office, shipping and/or set up • Holding / Carrying Costs • tied up capital (item value), staff & equipment, obsolescence, perish ability, shrinkage, insurance & security, (rent/lease), audit, taxes. • Cost of being out of stock, cancelling an order • Scrap and re-working • Shortage Costs .

  7. Inventory Costs • Item cost • Carrying costs • Capital costs • Storage costs • Risk costs • Obsolescence • Damage • Pilferage • Deterioration

  8. Inventory Costs (cont) • Ordering costs • Production control costs • Setup and teardown costs • Lost capacity costs • Purchase order costs • Stockout costs • Capacity-associated costs

  9. Material-Flows Process Production Processes Work in process To Customer Stores warehouse Finished goods WIP From Suppliers WIP Inventory in transit

  10. Stock : Input (Flow in), Storage (Holding) and Flow out (Usage) Inventory Level Supply Rate Stock Level Rate of Demand (Usage)

  11. Economic Order Quantity (EOQ) • In trying to minimize inventory costs a company must find the order quantity which spreads the ordering or set-up costs over as many units as possible without incurring excess holding costs. • The EOQ model attempts to determine the amount of units to purchase which will minimize the total costs associated with ordering and holding inventory

  12. Economic Order Quantity (EOQ) • How to calculate EOQ ? • Tabular Approach /Trial and Error. (waste time) • Graphic Approach /By using charts. • Formula Approach /Mathematically .

  13. Total Cost Holding Costs Ordering Costs Qeoq Order Quantity (Q) EOQ Aim = Cost Minimization Holding + Ordering costs = total cost curve. Find Qeoq inventory order point to minimize total costs. Cost

  14. Economic Order Quantity (EOQ) • EOQ Assumptions • Demand is known and constant. • Lead time is known and constant. • Order and holding costs are averaged across all transactions. • Single product line • No quantity discounts - stable unit cost • No stock-outs allowed • Items ordered/produced in a lot or batch • Batch received all at once • Holding cost is linear based on average stock level • Fixed order + set up cost

  15. Calculate EOQ 2DS 2(Annual/Period Demand) (Order cost) Qeoq = = H Holding Cost (total unit cost * %storage) = Exercise EOQ and reorder point? • Annual demand = 12,000 units • Days/year in average daily demand = 365 • Cost to place an order = £500 • Holding cost /unit p.a. = £12 ( 20% Cost per unit) • Lead time = 7 days • Cost per unit = £60

  16. EOQ Solution 2DS 2(12,000 )(500) Q = = = 1000 units eoq H 0.2 * 60 Number of orders = Annual Demand / EOQ = 12000 / 1000 = 12 orders per year. Orders Cost = 12 * 500 = 6000 £ Total Holding Cost = 0.2*60*1000 2 = 6000. £ There for Total Inventory Cost = 6000 + 6000 = 12000 £

  17. EOQ Table – minimum TVc Avg.stock x item £ x hc % Oc + Hc

  18. Cost Estimation & Model Sensitivity • In practical way it’s difficult to estimate the variables in the EOQ model such as the holding cost. • Example: Not that much in sensitivity

  19. Extensions of the EOQ model 1. EOQ with Order Size Restrictions . 2. EOQ with Storage limitations . 3. EOQ with quantity discount .

  20. Extensions of the EOQ model 1. EOQ with Order Size Restrictions . Example: AICO ltd Demand Expected next year : 5000 units. Supplier packages only contains 400 unit for each. EOQ = 1000 unit when ordering cost 10$ & holding cost per unit 0.1$ We have two options : 800 unit or 1200 unit .

  21. Extensions of the EOQ model 2. EOQ with Storage limitations . Example: AICO ltd Demand Expected next year : 5000 units. Supplier packages only contains 400 unit for each. EOQ = 1000 unit when ordering cost 10$ & holding cost per unit 0.1$

  22. Extensions of the EOQ model 3. EOQ with quantity discount .

  23. The Reorder Point (ROP) when to place an order in units? Reorder point ROP = D * L D = Avg daily demand (constant) L = Lead time (constant) Annual Demand = 10,000 units Days per year considered in average daily demand = 365 Cost to place an order = £10 Holding cost per unit per year = 10% of cost per unit Lead time = 10 days Cost per unit = £15

  24. 10,000 units/year D = = 27.397 units/day 365 days EOQ and ROP example 2DS 2(10,000)(10) = 365.148 (366 units) Q = = H 1.50 eoq If lead time = 10 days, Reorder point = 27.39 * 10 days = 273.97 = 274 units Place order for 366 units. When 274 left, place next order for 366.

  25. Order Quantities & Reorder Points Average stock q/2 No. of units on hand q q safety or buffer level R L L Time R = Reorder point L = Lead time

  26. A . O r d e r q u a n t i t y o f 4 0 0 u n i t s I n v e n t o r y O r d e r O r d e r a r r i v a l a r r i v a l 4 0 0 O r d e r O r d e r A v e r a g e p l a c e d p l a c e d c y c l e i n v e n t o r y 2 0 0 0 1 0 2 0 3 0 4 0 5 0 6 0 D a y s Order Quantities & Reorder Points

  27. Safety Stock and Re-order Levels • Reserve - buffer - cushion against uncertain demand (usage) & lead time. • A basis for a "2-bin" system • Application to JIT? EOQ assumes certain demand & lead time. If uncertain, then: ROL = Average usage in lead time + safety stock (Avg. lead time x Avg. daily usage)

  28. How Much Safety Stock? Cost vs. safety level Depends on: • Uncertainty: demand & lead time • cost of • being out of stock • carrying inventory • increasingly better service • Service level policy • % confidence of not hitting a stock-out situation

  29. 2200 2000 Actual lead time is 3 days! (at day 21) Dip into safety stock Order Point Units 400 200 Safety Stock 0 18 21 Days Order Point with Safety Stock