1 / 21

Workpackage No.1 Disaster Management

Workpackage No.1 Disaster Management. Leader: International Security Competence Centre. Participants. Participant No.1 – PLUS (8,5 person-months) Participant No.4 – HFSC (3) Participant No.5 – FRK (2) Participant No.8 – ISCC (6) Participant No.10 – VGT (3) Participant No.14 – TEC (0,5).

hope
Download Presentation

Workpackage No.1 Disaster Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workpackage No.1 Disaster Management Leader: International Security Competence Centre CAST kick-off meeting, Salzburg 15 - 17 July 2009

  2. Participants • Participant No.1 – PLUS (8,5 person-months) • Participant No.4 – HFSC (3) • Participant No.5 – FRK (2) • Participant No.8 – ISCC (6) • Participant No.10 – VGT (3) • Participant No.14 – TEC (0,5) CAST kick-off meeting, Salzburg 15 - 17 July 2009

  3. Objectives • Provision of tools for disaster management • Assessment of threat and risk • Optimal countermeasures • Assessment of current training programmes on disaster management CAST kick-off meeting, Salzburg 15 - 17 July 2009

  4. Deliverables July 2010: • D1.1: DTIC Database on • Terroristic threats • Large scale industrial accidents • Natural catastrophes • D1.2: Report on current training programms January 2011: • D1.3: Catalogue on tactical procedures CAST kick-off meeting, Salzburg 15 - 17 July 2009

  5. Main structure of DTIC • Date and location of event • Analysis of time-line of the event • Analysis of technical characteristics • Analysis of consequences for man and environment • Disaster management by the FR CAST kick-off meeting, Salzburg 15 - 17 July 2009

  6. Main topics for Disaster management • Response time • Suitability of equipment • Effectiveness of search&rescue operations • Communication • Command&control • Emergency management structure • Interoperability CAST kick-off meeting, Salzburg 15 - 17 July 2009

  7. Proposal for Databases • FileMakerPro 10 • established internationally • extensive experience by PLUS • User-friendly and flexible • Coordination of design requirements • PLUS/ISCC, HFSC, FRK, SCTU • Implementation of Design by PLUS/ISCC CAST kick-off meeting, Salzburg 15 - 17 July 2009

  8. Threat- and Riskanalysis • Based on DTIC-Database • Terror attacks: • Motivation of terrorists for selection of a target • Logistic requirements • Probability of success of attack • Primary detrimental consequences for EU • Effectiveness of countermeasures, based on current training and equipment used in the EU CAST kick-off meeting, Salzburg 15 - 17 July 2009

  9. Threat- and Riskanalysis • Technical catastrophes • Probability • Primary detrimental consequences for EU • Effectiveness of countermeasures, based on current training and equipment used in the EU CAST kick-off meeting, Salzburg 15 - 17 July 2009

  10. Threat- and Riskanalysis • Natural catastrophes • (a) Probability for this type of natural catastrophe to occur in the EU • (b) Primary detrimental consequences for society in the EU • (c) Effectiveness of countermeasures by EU-First Responders to mitigate the impact on society, based on the current training and equipment used in the EU CAST kick-off meeting, Salzburg 15 - 17 July 2009

  11. Classified Information • PLUS: EU Restricted • HFSC: Unclassified • FRK: Unclassified • ISCC: EU Restricted • VGT: Unclassified • TEC: EU Unclassified CAST kick-off meeting, Salzburg 15 - 17 July 2009

  12. Expertise (anticipated) • PLUS: Assessment of threat and risk • ISCC: DTIC-Database, training-curriculum of police forces • HFSC: training curriculum of firefighters • FRK: training curriculum of paramedics • TEC: didactics • VGT: crisis management CAST kick-off meeting, Salzburg 15 - 17 July 2009

  13. 6step-workplan (1) Step 1: Establishment of the DTIC-database • Establishment of the DTIC-database, which will be the base for the threat-and risk assessment of the whole project. • This will be established by international data mining of open source and technical reports by collaboration with international fist responders communities • Responsibility: PLUS/ISCC • Output: Deliverable 1.1 (July 2010) CAST kick-off meeting, Salzburg 15 - 17 July 2009

  14. 6step-workplan (2) Step 2: Threat- and riskanalysis • Based on the DTIC-database the threat- and riskanalysis will be established • This will be the base for the assessment of the various curricula with respect to suitability to meet the risks and threats which have been identified. • Responsibility: PLUS /ISCC CAST kick-off meeting, Salzburg 15 - 17 July 2009

  15. 6step-workplan (3) Step 3: Compilation of currently available training-curricula of the first responders community • training-curricula of police forces: ISCC • training-curricula of firefighters. HFSC • training-curricula of partamedics: FRK • Step 3 will start parallel with step 1 CAST kick-off meeting, Salzburg 15 - 17 July 2009

  16. 6step-workplan (4) Step 4: assessment of current curricula • Assessment of the various curricula with respect to suitability to meet the risks and threats which have been identified • Police forces: ISCC • Firefighters. HFSC • Paramedics: FRK • This step is based on results of step 2 and step 3 CAST kick-off meeting, Salzburg 15 - 17 July 2009

  17. 6step-workplan (5) Step 5: compilation of the results of Step 3 and step 4 • Responsibility: VGT • Output: Deliverable 1.2 (July 2010) CAST kick-off meeting, Salzburg 15 - 17 July 2009

  18. 6step-workplan (6) Step 6: catalogue of tactical requirements for first responder procedures with consideration of modern didacic methods • Responsibility: TEC with support by VGT, FRK, HFSC • Output: Deliverable 1.3 (January 2011) CAST kick-off meeting, Salzburg 15 - 17 July 2009

  19. PLUS Contributors • Wilhelm Heidegger • Friedrich Steinhäusler • Thomas Wilflinger • Lyudmila Zaitseva • Contacts • Various FR from collaboration with NATO-projects CAST kick-off meeting, Salzburg 15 - 17 July 2009

  20. FRK Contributors • Mag.a Gabriele Sprengseis, MSc • Mag. Stefan Schönhacker (Kontaktperson) • Dr.in Karin Rainer • Mag.a Nadine Sturm • Contacts: • Red cross and Red crescent community CAST kick-off meeting, Salzburg 15 - 17 July 2009

  21. ISCC Contributors • Bernhard Schneider • leader of workpackage, contact person • Email: bernhard.schneider2@utanet.at • Phone: +43-664-5629744 • Lyudmila Zaitseva • Contacts: • police forces community ISCC: Mauerbachstrasse 43-45, A-1140 Vienna www.isccentre.at CAST kick-off meeting, Salzburg 15 - 17 July 2009

More Related