1 / 5

WBS 4.1.1 Instrument Management

Gamma-ray Large Area Space Telescope. WBS 4.1.1 Instrument Management. Tanya Boysen LAT Project Controls Manager tkb@slac.stanford.edu. Summary of Cost Changes.

hollye
Download Presentation

WBS 4.1.1 Instrument Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope WBS 4.1.1Instrument Management Tanya Boysen LAT Project Controls Manager tkb@slac.stanford.edu

  2. Summary of Cost Changes • Overall methodology: Change in instrument delivery date assumed to be from 7/14/05 to 9/28/05, so added 2.5 months schedule at current rate (~$900K) In addition: • HEPL • Incorporates pending changes in June 04 proposal to NASA • Adds two graduate students • Pending review by Peter Michelson • UCSC • Adds students, reflects one-year reduction in budget (change in funding source)

  3. Summary of Cost Changes, Cont’d • SLAC • Reflects funding change for computer support • Extends peak level of PMCS support for four months (rather than 2.5) to keep pace with project schedule; adds incremental budget for rebaseline implementation • Increases budget for Lockheed Martin thermal support to full-time

  4. Change Detail

  5. Change Detail, Cont’d

More Related