An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EFFECTIVENESS OF D by D: FINANCIAL RESOURCES vs ABSORPTION CAPACITY OF LGAsDraft report presentation25th February 2010Prof. Athumani J. LivigaMaureen RoellProf. Amos K. L. Mhina

  2. Contents • Background and objectives • Methodology • Findings of the Study • Conclusions • Recommendations

  3. Background to the study • LGAs main providers of basic services to the people; • Major implementers of Government policies at the local level; • Undertake specific functions: - oversee and execute policies, laws, regulations, procedures and guidelines from the Central Government; - carry out community development in economic terms, for the people within the areas of jurisdiction • Receive increasing amounts of financial resources from both CG and DPs

  4. Objectives of the Study General objective: To analyze the effectiveness of Decentralization by Devolution in terms of matching deployed financial resources with the absorption capacity at the LGAs. Focus: Two sectors – health and education (examining factors that enhance or diminish absorption capacity on both supply and demand sides

  5. Specific objectives Several specific objectives including: • to assess existing LGAs business/operational practices (governance and administrative systems) in relation to increased resource at that level; • to assess the existing gap (upward or downward) between financial resources received and absorptive capacity at LGAs (the level of resources that is actually spent/could be spent if made available); • to assess the flow of information (information systems) at all levels; centre, regional secretariats, LGAs and lower level LGAs and how this affects absorptive capacity;

  6. Specific objectives cont. • to assess existing intergovernmental transfer systems, the way funds are disbursed from the Treasury to LGAs, in terms of timeliness and adequacy; • to provide an assessment of the effectiveness of formula-based allocation of resources. Also assess the relevance of the variables used in determining allocation of resources on the basis of formula in various sectors; • to analyze the recurrent and development budget performance at LGA level for the past three years paying special attention to the following:

  7. Specific objectives cont. • to assess the implementation role of the Public-Private Partnership approach in service delivery at all levels of LGAs. • to assess procurement regulations and processes and the existence of procurement plans; • to assess procedures around the production and submission of progress reports in facilitating the release of financial tranches; and • to analyze any other issue found to be relevant to the study that impact on the efficient functioning of LGAs.

  8. Methodology A participatory approach employed Three main methods used: • Literature review • Interviews with stakeholders (MDAs/LGAs) • Synthesizing information generated from the documents and views of stakeholders

  9. The Study Findings Five General Observations: • LGAs have accepted their role as lead implementers of government policies, laws, regulations and directives; • LGAs appreciate increased financial resources currently being sent to them by the central government as well as DP; • LGAs have exhibited increased competence in absorbing, managing and monitoring resources;

  10. General observations Cont. • Delays in disbursement of development funds especially by DPs is hampering effective implementation of development projects by LGAs; and • LGAs absorption capacity is constrained by a number of factors from both the supply and demand sides.

  11. Specific observations/findings Governance and administrative systems • Administrative systems (structures and organs) exist and functioning in most LGAs • Governance aspects have improved – internal control mechanisms (IA) in place • Procurement regulations followed (PMU in place) • Political environment does not always provide the support LGA management would require to fulfill obligations

  12. Gap between financial resources and absorption capacity at LGAs • LGAs have required absorption capacity to manage, supervise and report on resources made available to them as exemplified by: • Receipt of unqualified audit opinion fro CAG • Passing assessment criteria to obtain LGDG funds • Production of progress reports and receipts of subsequent tranches of funds

  13. Timeliness and adequacy of intergovernmental transfer systems • Transfer of PE is consistent as is the case of OC, development funds not predictable (start towards 3rd and 4th quarters) in time and in time and amount • Big problem with transfer of development funds from DPs, not predictable • Transfer of funds not accompanied by explanation regarding the intended purpose of the funds

  14. Effectiveness of formula based allocation of resources • Principle aims at equity and better distribution of resources • Resource allocation to LGAs based on formula has increased reliability of funds both for OC and development (Local) • Criteria used (size, population, poverty level etc) do not consider special circumstances under which LGAs operate • The Case of Moshi (population) • Morogoro (terrain and poor infrastructure)

  15. Recurrent and development budget performance at LGA level • Overall performance is good, reflects plans and priorities • Problems though remain in some areas including: • Late arrival of funds resulting in roll-over of funds, now regular and generalized practice • Weak supervision of contracts resulting in some cases topoor works (inadequate documentation) • Procurement procedures at LLGA not in conformity with Procurement Act

  16. Reports of the CAG and action taken by various authorities • General improvement in LGA financial management noted • Problems still persist in some areas including: • Audit queries • Too many accounts • Too many instructions from different sources, difficult to adhere • Relevant authorities take too long to discipline non performers or those showing bad behaviour

  17. Reports of the CAG cont. • LGA still use double accounting system, manually and Epicor (which is not rolled out to all LGAs) • Despite the adoption in 2004 of IFRS and IPSA, LGAs prepare books neither in line with one or the other

  18. Implementation of PPP approach in service delivery • Approach well accepted and used by LGAs as exemplified by formation of PMUs • A number of problems exist: • Some LGAs cannot find or attract high quality contractors • Late arrival of funds interfere with implementation of procurement procedures • Some LGAs could perform some works but fear reprisal from LAAC and other authorities

  19. Procurement regulations and existence of procurement plans • Procurement regulations are followed but not all LGAs have procurement plans that they strictly adhere to. • Procurement Act and regulations for LGAs are constraining in a number of ways: • Prohibit the signing of contracts before funds are secured • Process takes time and compounded by late arrival of funds delays implementation (case of roads)

  20. Production and submission of reports for release of funds Accepted by LGAs as good governance principle but complain as follows: • There are too many and frequent report requirements (to CG and DPs) • Report writing is taking too much LGA staff time at expense of e.g. supervision • Some planning officers are almost permanently involved in report writing

  21. Profile of staffing levels at LGAs • Steady increase in LGA employment both in absolute terms and relative to total public sector employment • Still experience shortages of engineers, financial management staff, accountants, planners and auditors • Inequality of distribution of staff in LGAs (location, holding harmless) • Serious shortages exist especially in the health sector followed by education

  22. Profile of staffing levels cont. • Several factors complicate the staffing situation in LGAs: • LGAs are still bound by strong regulations by PO-PSM; • Transfers and reprimand of not performing officials not under control of LGAs; • Training institutes are not able to cope with enormous demand for professional and specialized staff; • No special incentives for under-served areas to attract and retain staff

  23. Other factors that impact on the efficient functioning of LGAs • Internal factors include: • Financial resources, LGAs more dependent on external rather than own sources • LGAs do not have (according to establishment) the required numbers of staff with require qualifications and experience • The relationship between politicians and staff is lukewarm, due to mistrust, staff shy away from making decisions

  24. Other factors impacting on LGA … cont. • External factors include: - Political interventions from higher levels, orders and regulations have to be obeyed irrespective of real needs of LGAs and their priorities - Decisions to transfer LGA staff made with little or no consultation with LGAs - Adverse weather conditions

  25. Conclusions and recommendations • In view of the above the study concludes and recommends as follows: • Review the planning and budgeting cycle at LGA level in line with the reality of cash availability and unpredictability of funds in terms of timeliness and amounts. • Develop or identify less complicated management tools and make them compatible with each other, especially regarding Epicor.

  26. Conclusions and recommendations cont. • Upgrade the assessment criteria for LGDG as way of improving the quality of management in LGAs. • Use appropriate channels and systemize the mechanisms to inform the LGAs on intergovernmental transfers • Improve the information flows between MDAs and Regional Secretariat, so that they can play their role of supervisor and facilitator.

  27. Conclusions and recommendations cont. • There is need to apply the formula based PE allocation to ensure equity for remote and less endowed LGAs. • There is need to put into place special incentives to draw staff voluntarily to these LGAs. • By joining forces and comparing details, MoFEA and PMO-RALG could address the inequality of staff between the LGAs if they really want to.

  28. Conclusions and recommendations cont. • MoFEA needs to integrate the carry over system into the mainstream and clearly inform the LGAs on the procedures and reporting. • MoFEA needs to institute reliability in the exact month of transfer of development funds so that LGAs can make preliminary preparations for plan implementation. • MoFEA needs to address these issues with the DPs and foresee/prepare for the different scenarios

  29. Conclusions and recommendations cont. • LGAs need to put more effort to mobilize own funds by facilitating commercial activities, which would be sources of local tax. • Review the regulations for procurement at village level • Follow up on ward and village expenditure and implementation • Include ward and village levels in monitoring and reporting

  30. Conclusions and recommendations cont. • CAG should have more power to enforce that LGA take the appropriate action in follow up of the audit reports. • Or other mechanisms should be established eg. Insert it in the criteria for the Assessment or next audit report will be qualified/adverse, etc. • LGAs need to avoid compromising their supervisory tasks through giving contractors work when there are no funds to pay them

  31. Conclusions and recommendations cont. • Joint revision of the regulations should smoothen the expenditure of funds. • Guidelines on how to deal with procurement at village level need to be developed based on simple and uncomplicated rules • LGAs to inform the public on the consequences of political interference from higher levels • Lobby at parliament and involve parliamentary committees in reacting to such interferences

  32. THANK YOU FOR YOUR ATTENTION