Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT Preloader

Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT - PowerPoint PPT Presentation


  • 128 Views
  • Uploaded on

2Texas Nodal. Current Information. As detailed in the Nodal Protocols, the cases for the CRR Annual Auction will be constructed up to 18 months before the period in which the CRR is validModeling network topology information 18 months in advance has been historically limited to information

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT' - heaton


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript