RENAISSANCE LYON WP 2 Progress and Plan - PowerPoint PPT Presentation

slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
RENAISSANCE LYON WP 2 Progress and Plan PowerPoint Presentation
Download Presentation
RENAISSANCE LYON WP 2 Progress and Plan

play fullscreen
1 / 9
RENAISSANCE LYON WP 2 Progress and Plan
114 Views
Download Presentation
hayes
Download Presentation

RENAISSANCE LYON WP 2 Progress and Plan

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. RENAISSANCE LYON WP 2 Progress and Plan Christophe Ménézo A/Prof & INSA Lyon-CETHIL (Thermal Science Centre of Lyon)

  2. WP 2.1 Electrical Network • Planned Activities: - Platform of measurements of the impact of the PV on the electrical distribution networks (at INSA of Lyon) - Measurements of the impact of PV systems installed in Lyon-Confluence Area on the distribution network

  3. WP 2.1 Electrical Network • Measurement Platform at INSA Electricity quality evaluation produced by standard EN 50-160 inverter • Visit of site • Definition of platform objectives and design • Search for complementary support (Rhône-Alpes Region) • Selection of a supplier (Tenesol) Done

  4. WP 2.1 Electrical Network • Measurement series led on Lyon-Confluence Network • Project Submission to the National Reasearch Agency (ANR) • Agreement between EDF R&D, INES RDI, Transénergie and INPGrenoble • °Contact with INSA School of Electrical Engineering °Master student subject Done

  5. WP 2.1 Electrical Network • Measurement Platform at INSA Electricity quality evaluation produced by standard EN 50-160 inverter • Installation of the platform : 2 kWc • Definition of the measurements protocol • Installation of Practical Courses for Engineering Students of INSA • j Planed M13-M30

  6. WP 2.1 Electrical Network • Measurement series led on Lyon-Confluence Network • Constructive data-gathering of the distribution network on the Lyon-Confluence area • Measurement Protocol definition with EDF R&D and INSA • Waiting for construction of the buildings and PhotoVoltaic systems

  7. WP 2.2 Experience Feedback - Monitoring • Planned Activities: Multiscale Monitoring • Global Monitoring • Detailed Monitoring • Localised Monitoring ENERTECH

  8. WP 2.2 Experience Feedback - Monitoring • Global Monitoring (installation by promoters and dealers) - Counting and sub-counting heating room and sub-station and Solar Domestic Hot Water - Counting and under counting electricity in building • Detailed Monitoring (installation by Enertech) -By housing - Followed Consumption: Cooking, lighting, washing machine - Followed thermal evolution • Localised Monitoring (installation by INSA-CETHIL) -Some residences which have been numerically modeled - Eventually some innovating energy systems

  9. ENERTECH ENERTECH WP leader contact WP 2 Olivier Sidler Sidler@club-internet.fr ENERTECH