David Hackett, Nodal EMS PM 6 February 2008. Nodal EMS Update. EMS Generation Sub-system (EDS 3 Rel 6) Schedule Status Update. Plan : 02/15/08 - Current : 02/29/08. Plan : 02/15/08 - Current : 04/02/08. Plan : 12/14/07 - Current : 12/21/07. EMS 3B ACE Calculation Emergency Base Points

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'David Hackett, Nodal EMS PM 6 February 2008' - hashim


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
David Hackett, Nodal EMS PM

6 February 2008

Nodal EMS Update

Texas Nodal Program Update

ems generation sub system eds 3 rel 6 schedule status update
EMS Generation Sub-system (EDS 3 Rel 6) Schedule Status Update

Plan : 02/15/08 - Current : 02/29/08

Plan : 02/15/08 - Current : 04/02/08

Plan : 12/14/07 - Current : 12/21/07

  • EMS 3B
  • ACE Calculation
  • Emergency Base Points
  • Regulation deployment
  • Updated desired base points
  • Resource Limit Calculator
  • EMS 3C.1 (pre-FAT complete with a limitation)
  • Load Resources and Controllable Load Resources
  • Responsive Reserve functionality
  • EMS 3C.2 (FAT Complete 02/29/08)
  • Non-spin functionality
  • Ancillary service capacity monitor
  • EMS 3C.3
  • Resource Qualification Testing Tools (Implementation approach was not finalized until a few weeks ago, currently working a temporary solution using PI)
  • Support Multiple Frequency Sources (Integration)

EMS Releases

Dec

Jan

Feb

Mar

Apr

May

Jun

ACE Calculation & Pre-conditions

LFC Individual QSE testing

LFC Total

System Test

  • EDS 3 Release 6.2
  • Regulation without Optimization
  • Reg-Up and Reg-Down allocation to QSE’s
  • Updated Desired Base Points & Base point Ramping
  • Regulation Output Control signals
  • Allocation of Regulation signals
  • EDS 3 Release 6.1
  • ACE Calculation
  • RLC
  • Emergency Base Points

EDS 3 Rel 6

  • LFC Performance
  • Frequency Selection
  • Responsive reserve calculation
  • Responsive reserve deployment for Load Resources
  • Ancillary Service Capacity Monitor
  • Regulation and RRS Qualification testing feature

February 06, 2008

Texas Nodal Program Update

ems 4 eds 4 rel 9 schedule status update
EMS 4 (EDS 4 Rel 9) Schedule Status Update

Plan : 02/15/08 - Current : 04/18/08

Plan : 02/15/08 - Current : 03/7/08

  • EMS 4.4
  • CIM Importer
  • EMS 4.1 (FAT Complete 2/23/08)
  • Voltage Stability Analysis
  • Transient Stability Analysis
  • Study Network Security Analysis
  • EMS 4.2 (FAT Complete 2/29/08)
  • Midterm Load Forecasting
  • Transmission Constraint Management (Incremental)
  • Forced Outage Detection (Incremental)
  • Dynamic Ratings (Incremental)
  • External Interfaces (Incremental for DAM/RUC)
  • EMS 4.2 (FAT Complete 3/7/08)
  • Wind Power Forecasting
  • Dynamic RAP integration
  • Integration : Study Mode SE, Online Power Flow, Study Server

EMS

Plan : 04/15/08 - Current : TBD

  • EMS 4.3
  • Zonal Project Migration
  • Power Flow Trouble Shooting
  • EMS 5
  • Outage Evaluation
  • Voltage Support

Jan

Feb

Mar

Apr

May

Jun

DAM / RUC Submission testing

Initial DAM / RUC Execution

Execute DA, Adj Period and

RT Operations

  • EDS 4 Release 9.3
  • Mid Term Load Forecast
  • Generic Constraints
  • Resource Commitment Status
  • Load Distribution Factor

EDS 4 Rel 9

  • Dynamic Ratings / Static Ratings for transmission equipment
  • EMS interfaces for RUC

Continue Zonal to Nodal conversion of Model in the EMS EDS system in the absence of CIM importer

  • Wind Power Forecasting
  • CIM Importer

Texas Nodal Program Update