1 / 67

Technical Working Group Reports

Technical Working Group Reports. Bridge Equipment Pavement Roadway and Roadside Highway Safety and Reliability. Bridge Working Group. 2012 Work Plan Accomplishments. Conducted a survey on commonly used deck patching products used by state and contract forces.

hasad
Download Presentation

Technical Working Group Reports

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Working Group Reports • Bridge • Equipment • Pavement • Roadway and Roadside • Highway Safety and Reliability

  2. Bridge Working Group

  3. 2012 Work Plan Accomplishments • Conducted a survey on commonly used deck patching products used by state and contract forces. • Sponsored andsupporting research initiatives • Working on a process for identifying and promoting innovative bridge preservation products, materials, and techniques for use by bridge preservation practitioners • Worked with the ETG, TSP-2, T-9, in getting the definition of bridge preservation approved by the Standing Committee on Highways

  4. 2012 Work Plan Accomplishments • Supporting FHWA’s Long Term Bridge Performance Program (Bridge Preservation & Durability ETG) • Supporting FHWA’s Bridge Preservation ETG’s efforts • Identified bridge maintenance related training materials that will be disseminated to users • Conducting regular quarterly teleconferences with the Bridge TWG members.

  5. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • Use of AASHTO Bridge Element Condition States • Update the AASHTO Bridge Health Index to be Condition-based driven (remove the cost dependency from the current calculation) • Classifying Bridge Condition under Good, Fair, Poor or a similar grading system

  6. 2013 Work Plan • Focus Areas - Research • NCHRP 14-23 – “Practical Bridge Preservation Actions and Investment Strategies” • NCHRP 14-24 – “Guidance for Communicating the Value of Highway System Maintenance and Preservation” • NCHRP 14-30 – “Extending the Life of Highway Bridge Coating Systems Through the Use of Spot Painting with Minimal Surface Preparation” • NCHRP 14-28 – “Condition assessment of bridge post tensioning and stayed cable systems using NDE” • Task 330 Maintenance Investigating the Use of Pavement Preservation Products as Low Cost Waterproofing Treatments for Bridge Decks

  7. 2013 Work Plan • Focus Areas - Workforce Development • Survey the State DOTs • Identify and collect available bridge maintenance training materials • Collaborate with FHWA, States, and Industry partners to host the training materials and make available to users

  8. 2013 Work Plan • Focus Areas - Performance Measures • Work with other AASHTO Subcommittees and FHWA to promote: • The use of bridge element condition assessment • Transition a way from the use of structurally deficient measurement • Use of a condition-based bridge health index (remove the cost dependency from the current HI calculation) • Use of a Good, Fair, Poor measurements or similar grading system • Survey the State DOTs to identify current measures used in bridge maintenance, i.e. work backlog; flag systems, etc.

  9. 2013 Work Plan • Focus Areas - Environment • Proposing two research statements: • Quantify the environmental benefits of bridge preservation • Identify environmental requirements for bridge washing • Promote the use of recycled glass as an abrasive blasting medium material in bridge maintenance.

  10. Research • Proposed Topics for Environmental Excellence Work plan • Identify strategies and practices that promote environmental sustainable bridge maintenance practices.

  11. Research • Research Implementation Recommendations • 2005 14-15 Developing a National Database System for Maintenance Actions on Highway Bridges • 2007 234 Guidelines for Selection of Bridge Deck Overlays, Sealers, and Treatments • 2013 14-29 Developing a Consistent Coding and Training System for Emergency Structure Inspections (F-02) • 2013 14-30 Extending the Life of Highway Bridge Coating Systems Through the Use of Spot Painting with Minimal Surface Preparation (F-03) New Research Problem Statements and Proposed Resolutions (see next slide)

  12. Research • New Research Problem Statements • Quantifying environmental benefits of bridge preservation • Investigation of the Use of Reduced Residual Compressive Stresses for Arresting Steel Girder Cracks Induced by Out-of-Plane Bending • Detection and Remediation of Chloride Contamination Prior to Coating Structural Steel • Structural Rehabilitation of Corrugated Metal Pipe through the Application of a Centrifugally Cast Cementitious Material

  13. Research • New Research Problem Statements (Continued) • Identifying and addressing the failures of small movement bridge expansion joints. • Current practices, benefits, and environmental requirements for bridge cleaning and washing • Reducing traffic impacts by using innovative bridge maintenance and preservation techniques

  14. Proposed Resolutions • Resolution on the Promotion of Highway Bridge Measurement Criteria that Promotes Bridge Preservation

  15. Equipment Working Group

  16. 2012 Work Plan Accomplishments • Research NCHRP Project 20-7 –Task 309: Challenges and Opportunities: A Strategic Plan for Equipment Management Research • 9 topics, approximately 5 research problem statements could result • Final report of the workshop deliberations and findings completed and posted on EMTSP Website • Topics prioritized by attendees of 2012 National Equipment Management Conference (more later)

  17. 2012 Work Plan Accomplishments • Research (Continued) NCHRP Problem Statement 2013-F-04, “Guidelines for the Development of Highway Operations Equipment Replacement Lifecycle Criteria” • Based on preliminary information from meeting in Irvine last year • Developed at TWG meeting last year • Submitted to Subcommittee last August • SCOM submitted to NCHRP as priority #3 of 4 • Favorable review by NCHRP • Was not recommended by the Standing Committee on Research

  18. 2012 Work Plan Accomplishments • Research (Continued) Initiated NCHRP 20-05 Task 43-14 Fleet Funding Management and Charge-Back Systems to Develop Optimum Fleet Sustainability

  19. 2012 Work Plan Accomplishments • Workforce Development Developing a model training and certification curriculum appropriate for state equipment managers by revising the skills matrix developed by the TCCC

  20. 2012 Work Plan Accomplishments • Performance Measures Developed resolution for adopting applicable Performance Measures developed through the EMTSP regional partnerships: • Evolved from the 2012 National Equipment Fleet Management Conference in Mobile, Alabama • Michigan DOT spearheaded effort with volunteers from other regions assisting in refining and additional measures

  21. 2012 Work Plan Accomplishments • Environment • Monitoring and disseminating information regarding environmental issues that have potential impact upon highway equipment fleets by utilizing the equipment industry to identify national regulatory changes and communicate to the equipment management professionals. • Information will be posted on EMTSP website and communicated at partnership meetings

  22. 2012 Work Plan Accomplishments • Reports • AASHTO Equipment Reference Book for 2012 • AASHTO guide, Decision Making for Outsourcing and Privatization of Vehicle and Equipment Fleet Maintenance • NCHRP Project 20-7 –Task 309 - Challenges and Opportunities: A Strategic Plan for Equipment Management Research

  23. 2012 Work Plan Accomplishments • Task Forces • EMTSP Oversight Panel • EMTSP Regional Partnerships

  24. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • Equipment fleet performance measures • Utilization • Preventive maintenance • Retention • Availability/ Downtime

  25. 2013 Work Plan • Focus Area – Research • Continue working on NCHRP 20-07/309 Research topics as prioritized by attendees of 2012 National Equipment Management Conference:

  26. 2013 Work Plan • Focus Area – Research • Continue working on NCHRP 20-05 Task 43-14 Fleet Funding Management and Charge-Back Systems to Develop Optimum Fleet Sustainability • Draft Interim Report being reviewed by Project Panel

  27. 2013 Work Plan • Focus Area - Workforce Development • Continue work on developing the model training and certification curriculum appropriate for state equipment managers by revising the skills matrix developed by the TCCC

  28. 2013 Work Plan • Focus Area - Performance Measure • Continue work of EMTSP Partnerships of identifying additional applicable Performance • Review and refine existing performance measures if needed

  29. 2013 Work Plan • Focus Area – Environment • Continue monitoring and disseminating information regarding environmental issues that have potential impact upon highway equipment fleets by utilizing the equipment industry to identify national regulatory changes and communicate to the equipment management professionals. • Continue posting Information on EMTSP website and communicating at partnership meetings

  30. 2013 Work Plan • Reports • Produce and distribute next year’s AASHTO Equipment Reference Book

  31. 2013 Work Plan • Task Forces • Continue overseeing the EMTSP • Coordinate and schedule 2013 Northeast & Midwestern Equipment Management Joint Partnership Meeting (TBD) • Coordinate and schedule 2013 Western States Highway Equipment Managers Association (WSHEMA) Partnership Meeting , (TBD) • Coordinate and schedule 2013 Southeastern States Equipment Managers Conference Partnership Meeting (TBD)

  32. Research and Proposed Resolutions • Proposed Topics for Environmental Excellence Workplan • None at this time

  33. Research • Research Implementation Recommendations • AASHTO Guide - Decision Making for Outsourcing and Privatizationof Vehicle and Equipment Fleet Maintenance • Result of NCHRP Project 13-03A • Based on NCHRP Report 692 • AASHTO Guidelines for Selection and Application of Warning Lights • Result of NCHRP Project 13-02 • Based on NCHRP Report 624

  34. Research • New Research Problem Statements “Guidelines for the Development of Highway Operations Equipment Replacement Lifecycle Criteria”

  35. Proposed Resolutions • Proposed Resolutions • 12-03 Equipment TWG Performance Measures Resolution • 12-04 Equipment TWG RESOLUTION - EMTSP PARTNERSHIP MEETINGS

  36. Pavements Working Group

  37. 2012 Work Plan Accomplishments General Accomplishments by the PTWG and SCOM • Sustained a high level of maintenance interest and involvement in the area of System Preservation. • Promoted the Transportation System Preservation Technical Services Program (TSP2) and the Regional Pavement Preservation Partnerships. • Promote the utilization of the National Center for Pavement Preservation for research management.

  38. 2012 Work Plan Accomplishments • Focus Areas • Research • Assisted in the implementation of the Pavement Preservation Roadmap. • Reviewed TRB/NCHRP Completed Research for possible publication as AASHTO Manuals • Workforce Development • Supported NHI Class Development • Supported Web-Based Training Efforts

  39. 2012 Work Plan Accomplishments • Focus Areas • Performance Measures • Conducted a Survey on RSL = 0 • Environment • Supported the development of life cycle assessment methodologies that demonstrate the environmental-friendliness and sustainability benefits of pavement preservation techniques and strategies.  • Reports • None were Produced • Task Forces • No Separate Task Forces by the PTWG.

  40. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • International Roughness Index • Structural Adequacy • Remaining Service Life (RSL) • Damage Claims • Public Satisfaction Surveys

  41. 2013 Work Plan • Sustain high level of maintenance interest and involvement in the area of System Preservation. • Promote the Transportation System Preservation Technical Services Program (TSP2) and the Regional Pavement Preservation Partnerships. • Enhance the Internal Communications of the PTWG by: expanding the membership list; improving the e-mail address list; and conducting quarterly telephone conference calls and/or webinars. • Development and promotion of common performance measures for pavement preservation activities. • Work to confirm and enhance the linkage of pavement preservation activities to overall crash reductions.

  42. 2013 Work Plan • Development and promotion of certification programs for pavement preservation contractors and/or personnel. • Support the development and implementation of performance management with asset management tools.  • Work to develop a guideline that will uniformly define the Remaining Service Life (RSL) of zero for use by our member agencies. • Assist in the Implementation of SHRP2 R-26: Pavement Preservation for High Volume Roads.

  43. Research Problem Statements • Development of Non-Destructive Test Methods to Determine Oxidation, Raveling, Flushing, and other Environmental and Functional Distresses of Asphalt Pavements. • Performance Measures that Consider the Contributions of Preservation to Pavement Performance and Service Life. • Project to Support the a Task Force of the AASHTO Joint Technical Committee on Pavements and the Subcommittee on Maintenance Pavement Technical Working Group in the Development of Performance Measures for Pavements

  44. Proposed Resolution A Resolution Expressing the AASHTO Subcommittee on Maintenance’s Support for the FHWA Pavement Preservation Expert Task Group and Requesting Biannual Meetings for the Group.

  45. Roadway/Roadside Working Group

  46. 2012 Work Plan Accomplishments • Focus Areas • Research • Stormwater Best Management Practices – NCHRP 25-40 • Low-cost Roadway Environmental Practices Survey and Discussion (generating further ideas for research and synthesis) • Roundtable discussion for brainstorming potential research topics

  47. 2012 Work Plan Accomplishments • Focus Areas • Workforce Development • Presentation of NHI Maintenance Leadership Academy in Chattanooga, TN • October 1-10 and November 6-11 • Blended Learning approach • Strong focus on preservation and performance management, along with workzones, environmental considerations • $3500 per participant (plus travel and lodging expenses)

  48. 2012 Work Plan Accomplishments • Focus Areas • Environment • LEED Rest Areas (North Carolina) • Facilities Energy and Environment Best Practices (Colorado) • Performance Measures • Peer Exchange – Best Practices in Privatization of Maintenance Functions (August 2012 in Anaheim, CA) • MQA/ MMS Implementation: Alabama/ Mississippi Partnership • WSDOT MMS presentation

  49. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • Accidents: Potential for maintenance activities to have an impact on injury accidents and/ or PDO • Safety hardware - pavement markings, wet visibility, condition of signs • Collisions with animals (mowing for safety vs. reducing mowing for funding and habitat)

  50. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • Environment/ Sustainability performance measures may not be consistent or reflective of with goals and activities of maintenance • Action: Propose to work with AASHTO Subcommittee on Environment to align performance measures

More Related