Process log Status of working Monitor data during EP & Rinsing process Comparison of EP2

MHI#14 号機の2回目の EP1. Period : 2011/4/19 ~ 4/21 Process : EP1(100 μ m, 50mA/cm 2 ), Normal 1 st Water Rinsing [90min], Degreasing (FM-20, 2%) [30min], HPR [6 hours] Preparation :Attachment to jigs Workers : M. Sawabe, Kirk, M. Satoh (KEK),

Download Presentation

Process log Status of working Monitor data during EP & Rinsing process Comparison of EP2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MHI#14号機の2回目のEP1 Period : 2011/4/19 ~4/21 Process : EP1(100μm, 50mA/cm2), Normal 1st Water Rinsing[90min], Degreasing (FM-20, 2%) [30min], HPR [6 hours] Preparation :Attachment to jigs Workers : M. Sawabe, Kirk, M. Satoh (KEK), K. Nakamura, N. Tasaki, F. Tsukada (Assist Engineering Co.), T. Okada (K-VAC), M. Asano, S. Imada, T. Yanagimachi (Nihon Advanced Technology) Process log Status of working Monitor data during EP & Rinsing process Comparison of EP2 STF Cavity Group Meeting @2011/4/25 Kirk

  2. Condition of EP & Rinsing • EP acid (4/20のEP1後のサンプルを使用) • Nb ingredient : 9.6g/ℓ • HF ingredient : ? g/ℓ (全体?g/ℓの65%が反応に使われる) • Al ingredient : 18mg/ℓ • Current density : ~50mA/cm2 (EP1の時は通常の電流密度で行う) • Cavity surface temperature : <40℃ • Control Voltage : 温度と電流密度を見ながら制御 • With normal N2 gas flow during extracting EP acid (8ℓ/min) • 1st water rinsing (1.5hour) • 10min (storing)/3min (flushing)で行う • Degreasing (30min) • FM-20 (2%) • HPR (~6 hours) • 28m (1 turn, w/o blind flanges) • 5h16m (6 turns, w/o blind flanges) STF Cavity Group Meeting @2011/4/25

  3. Process log ① 4/19 9:00 MHI#14 is moved to EP area 10:00 Check every flange [O.K.] (polishing HOM at input side) 10:05 Attachment of jigs for EP 10:30 HPR starts without cavity 11:00 Meeting for tomorrow’s working procedure 11:20 Set cavity to EP bed with crane 11:25 Installation of cathode bar to cavity 11:40 Set data logger to cavity (totally 12ch) Leak check with N2 gas [O.K.] 13:15 fin. STF Cavity Group Meeting @2011/4/25

  4. Process log ② 4/20 8:35 Cavity rotation starts / EP acid flow starts 8:59 EP1 starts 10:38 Alarm occurred due to low acid level in reservoir! @36.6μm Stop current flow and acid flow It was not recover even after pushing “Reset” button many times Check acid level meter in reservoir (dangerous working!) 11:02 EP acid flow restarts 11:04 EP1 restarts (Set 65μm) 13:58 EP1 stops [5h00m] / Idling rotation (3 rpm / 20min) / Plastic case detachment 14:16 Idling rotation stops 14:18 EP acid is removed from cavity with N2 gas flow(0.020MPa) 14:32 First rinsing with ultra pure water starts 16:02 First rinsing with ultra pure water stops [1h30m] 16:11 Detachment of restriction jigs / Data logger detached 16:25 Un-installation of cathode bar from cavity / washing cathode bar (No black mark) 16:35 transferring cavity from EP bed to wagon 16:58 Detachment of jigs for EP / Detaching every blind flange of teflon / Checking inside cavity (No mark) / Checking teflon surface (No mark) 17:06 Shower rinsing @CP area 17:15 Attachment of flanges for degreasing 17:20 Supplying degreaser into cavity 17:27 Degreasing with ultrasonic starts 17:57 Degreasing with ultrasonic stops [30min] STF Cavity Group Meeting @2011/4/25

  5. Process log ③ 4/20 18:00 Detachment of flanges for degreasing 18:15 Shower rinsing @CP area 18:25 Transferring cavity from wagon on turntable for HPR using crane 18:38 Checking tolerance between position of nozzle and center of beam pipe 18:40 1st HPR for inside cavity starts 19:08 1st HPR for inside cavity stops [0h28] 19:10 fin 4/21 9:08 2nd HPR starts 14:25 2nd HPR stops [5h17m] / Drying @HPR room 4/22 9:00 move MHI#14 to inspection room 4/25 9:00 optical inspection starts STF Cavity Group Meeting @2011/4/25

  6. Status of working ① STF Cavity Group Meeting @2011/4/25

  7. Status of working ② STF Cavity Group Meeting @2011/4/25

  8. Status of working ③ STF Cavity Group Meeting @2011/4/25

  9. Status of working ④ STF Cavity Group Meeting @2011/4/25

  10. Status of working ⑤ STF Cavity Group Meeting @2011/4/25

  11. Status of working ⑥ STF Cavity Group Meeting @2011/4/25

  12. Status of 2nd EP1 for MHI#14 ① current Tcavity Treservoir voltage Troom average current density EP1の場合は通常通り50mA/cm2で行う。 途中で2回ほどジャンプしているのは、 電圧を20V前後で調整していたことによる。 また、リザーバタンク内の液面計のトラブルに 因り、20分ほどの中断があった。 Tcavity STF Cavity Group Meeting @2011/4/25

  13. Status of 2nd EP1 for MHI#14 ② 左図は平均電流密度と電圧の相関 右図は定常状態での分布 STF Cavity Group Meeting @2011/4/25

  14. 最近のEP1の定常状態の比較 MHI#17のEP1の結果はドリフトの効果が大きい。 STF Cavity Group Meeting @2011/4/25

  15. Status of 2nd EP1 for MHI#14 ③ EP1の間の空洞表面温度の状況。 テープが取れてしまった #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Meeting @2011/4/25 Steady state: 38.5 35.1 34.5 32.4 34.3 20.4 30.8 33.7 32.3 37.0 35.4 11.3

  16. Status of 2nd EP1 for MHI#14 ④ EP1の間の空洞表面温度の状況(前ページの最後の拡大図)。 テープが取れてしまった #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Meeting @2011/4/25

  17. Status of UWR for MHI#14 ① #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Meeting @2011/4/25 Steady state: 19.1 18.2 18.8 17.0 17.9 17.5 17.3 18.5 17.7 18.2 18.3 17.7

  18. Status of UWR for MHI#14 ② 一次洗浄中の空洞温度の状況(前ページの拡大図) #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 STF Cavity Group Meeting @2011/4/25

  19. Status of UWR for MHI#14 ③ STF Cavity Group Meeting @2011/4/25

  20. Status of HPR for MHI#14 クリーンルーム作業を始めるために、クラス1000のフィルターのファンを入れたら、TOCが徐々に上がっていった。 STF Cavity Group Meeting @2011/4/25