1 / 8

VMM1 Electronics Status

VMM1 Electronics Status. Sarah Jones, Charlie Armijo, Ken Johns, Jason Veatch (Arizona) Jessica Metcalfe, Vinnie Polychronakos ( BNL ). VMM1 Readout Review. New “C-Card”. Existing BNL DAQ board with ADCs and Cyclone IV for readout, configuration. AZ Adapter Card (V1).

Download Presentation

VMM1 Electronics Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VMM1 Electronics Status Sarah Jones, Charlie Armijo, Ken Johns, Jason Veatch (Arizona) Jessica Metcalfe, Vinnie Polychronakos (BNL)

  2. VMM1 Readout Review

  3. New “C-Card” Existing BNL DAQ board with ADCs and Cyclone IV for readout, configuration • AZ Adapter Card (V1) AVNET LX9 with Spartan 6 FPGA for ethernet connection to switch

  4. Status • Mini-MMFE • Left-handed version (10 count) at assembly house • Testing @ BNL 7/6 or 7/9 • Right-handed version layout started by Dan Tompkins (reroute of input channels to VMM1) • Adapter cards • V2 with LVDS-RSDS and RSDS-LVDS submitted to PCB house – due next week • Decide after testing whether to stuff V1 or V2

  5. Status • Cables • Successfully made and tested data and real time address (trigger) cables • Need length specified for H6 use • LX9’s • In hand, one @ BNL, several @ Harvard, one @ CERN • Firmware exists (Nathan) to send UDP mock data and configuration packets • Being tested at Arizona and will also be sent to CERN • Firmware exists to read/write from FIFOs

  6. Status • BNL DAQ Cards • Due back from assembly house 7/6 • Firmware exists for communication with LX9 but needs testing and perhaps some additional specifications • Full chain tests @ BNL late this week and/or early next week • Testing configuration from DCS (George) on same time scale • 16-port switch • In hand @ CERN

  7. DAQ Status and Plans • Can be used for testing with Mamma DAQ • UDP datagram sent from LX9 at Harvard • Will be tested at Arizona this week • Communication between Jack’s BNL DAQ board and LX9 progressing well • Integration at BNL 7/2 – 7/11 including George Iakovidis et al. • Need meeting with Marcin on Mamma DAQ end

  8. Status • Other software • Code to send/receive UDP mock data between client and server sent to Marcin • Need feedback • Code to write tree from UDP data files in progress (Sarah) may be useful for Mamma DAQ • Offline analysis of school figures and tracking in progress (Jason)

More Related