An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Reinhard Roll 4th Philae post-launch workshop

  2. Budapest 07: the promise • feeding a sample from oven to MS via GC, bypassing GC columns • consequence of non-operational side terminal of tapping station. • PC#8 • That was our hope!! 4th Philae post-launch workshop

  3. PC#8: the reality • New software: • MS oven via GC • better HK • data compression • thoroughly tested: Simulation, GRM, FS • MS not working any more!!! • two non-nominal events, both immediately after switch-on of the MS • Most obvious explanation: Software • suspicion: damaged hardware • one interpretation: Damage in the HV of the MS 4th Philae post-launch workshop

  4. PC#8: the reality • Contingency Slot • downgrade to previous software • step-wise testing • Romap data for error analysis (Ampere-meter) • COSAC behaved like prior to PC#8 (i.e. working) • No permanent hardware damage! 4th Philae post-launch workshop

  5. MS PC#4 PC#8, contingency COSAC, empty mass spectra under similar temperature conditions 4th Philae post-launch workshop

  6. PC#8: the reality • Conclusion • The effect looked like a hardware failure (but is not) • Real reason unknown • Software effect as only plausible cause so far 4th Philae post-launch workshop

  7. PC#9 • Set of HK values • nominal • slightly different timing (seconds, harmless) 4th Philae post-launch workshop

  8. PC#10: the plan • Patch old software to allow MS oven via GC • no data compression • Romap in parallel (just in case) 4th Philae post-launch workshop

  9. PC#10: Details • Tests first (GC heating, MS sniffing) • Go/NoGo • Software upload and verification (EAFT) • Go/NoGo • Test again (GC heating, MS sniffing) • Go/NoGo • Combined test 1 (absorption oven) • Go/NoGo • Combined test 2 (empty oven) 4th Philae post-launch workshop