An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. First sector cooldownCryogenic ProductionReview

  2. QSV QSCA QSCC QSRA QURA QURC QUI QRL Sector 78 Cooldown Cryogenic system • Hélium storage: • 80m3 & 250m3 Vessels • 4.5K Refrigerator: • Compressors,Cold box • 1.8K Units: • Screw compressors,Cold box • Nitrogen pre cooler • Interconnecting box QSAA QSDN QSKA Ph Gayet AB/CO IS

  3. EW1 OS3 OS4 EW2 PVSS data servers 4.5K 1.8K Sectors PLC LHCA LHCC FIP GW Ethernet backbone (IT-CS) QSDN QSCCB QSKA QSCA QSAA QSRA QSV Main Dryer Comp 1.8K UCB 4.5K Comp 4.5K QURA QUI LCB 4.5K Worldfip nets Profibus nets QURC CB 1.8K Control Architecture For 78 COOLDOWN CCC Control room SHC8 Bat 2851 DS1 SHBB8 SDH8 SH8 SD8 SHM8 US IP8 US85 UX85 LHC Alcoves LHC Tunnel Ph Gayet AB/CO IS

  4. Control Dependencies Ph Gayet AB/CO IS

  5. I/O devices Field devices PCO devices AP development Phase 1 :Devices Specification Ph Gayet AB/CO IS

  6. Instantiation generation device type templates Supervisiondevice instance Devices Specification Device instantiation devices DB Scripts Instance Generator PLC device instance Device instantiation AP development Phase 2 :Devices Instanciation Supervision UNICOS FW UNICOS time stamped Middleware UNICOS library PLC Ph Gayet AB/CO IS

  7. Interlock Logic Configuration logic Global logic Dependent Object control logic AP development Phase 3 : LOGIC Spec. capture For Each system components the process engineers supply the logic associated to each logic placeholder in a template document Logic Placeholders Interlock Logic Configuration logic Global logic Dependent Object control logic Dependent Object control logic Dependent Object control logic Ph Gayet AB/CO IS

  8. Instantiation generation device type templates Supervisiondevice instance Devices Specification Device instantiation devices DB Scripts Instance Generator PLC device instance Basic Logic generation Device instantiation Logic Generator Logic Files Logic DB Logic skeleton Logic templates Placeholder Skeletons AP development Phase 4 : Logic Skeleton Generation Supervision UNICOS FW UNICOS time stamped Middleware UNICOS baseline PLC Ph Gayet AB/CO IS

  9. Synoptic Specification Synoptic views, … Manual production Logic Specification Control Logic Manual production AP development Phase 5: Process Logic & HMI Production & Maintenance Supervision UNICOS FW Device instantiation UNICOS time stamped Middleware Device instantiation UNICOS baseline PLC Ph Gayet AB/CO IS

  10. Instantiation generation device type templates Supervisiondevice instance META-MODEL Device instantiation devices DB Scripts Instance Generator Meta-Model PLC device instance Meta-ModelGenerator Logic generation Device instantiation Logic Generator Logic Files Logic DB Complete Logic code Logic templates Replace generic skeleton By Actual logic model Model based Generation for Sectors Supervision UNICOS FW UNICOS time stamped Middleware UNICOS baseline PLC Ph Gayet AB/CO IS

  11. Present Application status Point 6 Point 8 Point 4 Point 1.8 Point 2 QSV QSV QSV QSV QSV QSCCA QSCCB QSCA QSCA QSCCA QSCB QSCB QSCCA QSCB QSCCB QSCA QSCCB QSCB QSCCA QSCA QSCCB Surface QSDN QSDN QSDN QSAB QSAA QSAB QSAB QSAA QSAB QSDN QSAA QSDN QSAA (buildings+areas) AB-CO-IS QSRA QSRB QSRA QSRB QSRB QSRB QSRA QSRA QSKA QSKA QSKA QSKA Shaft QURA QURA QURA QURA QUIB QUIA QUIC QUIC QUIC Cavern QURCB QURCA QURCB QURCB QURCB QURCA QURCA QURCA QRL QRL QRL QRL QRL QRL QRL QRL AT-ACR Tunnel Sector 8-1 Sector 3-4 Sector 6-7 Sector 7-8 Sector 1-2 Sector 2-3 Sector 5-6 Sector 4-5 Ready in Unity/PVSS To be duplicated Version Waiting for Update by Master Version Master Version Under Development by AB/CO & AT/ACR Ph Gayet AB/CO IS Under specification by AT/ACR.

  12. Some Numbers Number of Application Versions Number of Devices Number of Datapoints sent to logging at 0.1hz max QSV QSV 14 1250 2456 1250 2457 27 2532 2456 4662 44 4814 28 26 QSCCB QSCA QSCCB QSCCA QSCB QSCA 4 QSCCA QSCB 5 4 7 QSDN QSDN QSAB QSAB 14 QSAB QSAB 14 14 QSRB QSRB 6 QSRA QSRA 4 QSKA QSKA 14 QURA QURA 4 1238 2219 92 QURCB QURCA QURCB QURCA 6 6 QRL QRL QRL QRL QRL QRL 9913 9913 26019 26019 Sector 8-1 Sector 7-8 Instance device Instances & Process logic Total :28553 Total : 68645 Ph Gayet AB/CO IS

  13. Cooldown status Ph Gayet AB/CO IS

  14. Good Production applications ready on due time Production methodology allow easy and clean maintenance All application under one supervision system Recurrent communication problem solved before CD Coherent and efficient powering and networking schema (no stop at last powercut) CNIC Implementation transparent. Operators trained and happy with proposed HMI Remote access via terminal server Not so good Too Many versions for logic that have induced some regression during system commissioning Each integration of a new system in PVSS can induce limited but painful regressions if strict procedures are not followed Need for reverse engineering tools One PLC stop that have induced several hours of delay Control loop on Ethernet are at risk Some discrepancies between production and sector HMI to solve Still some requirements to implement Too many users on terminal servers need of clusters Bilan Ph Gayet AB/CO IS