1 / 7

PLCS and S1000D Technical Issues

PLCS and S1000D Technical Issues. ISE 6 Phase 2 Technical Issues. S1000D PLCS DEX Need to exchange S1000D data modules and relationships to product model Listed under Business DEX section of plcs-resources But non content defined Linkage between product data and data modules

halil
Download Presentation

PLCS and S1000D Technical Issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PLCS and S1000D Technical Issues

  2. ISE 6 Phase 2 Technical Issues • S1000D PLCS DEX • Need to exchange S1000D data modules and relationships to product model • Listed under Business DEX section of plcs-resources • But non content defined • Linkage between product data and data modules • If design change occurs, need to identify the data modules (TM and training) affected so they can be reviewed and updated.

  3. HVAC Sys DM 1.1 HVAC Sys IETM 2 HVAC Ducts HVAC Sys Drawing1 HVAC Sys IETM 1 DM 1.2 HVAC Sys Drawing2 DM 2.2 Chillers Duct 2 DM 1.1 Mod 1 Radar IETM DM 1.3 Chiller 1 Mod 1 DM 1.2 DM 2.3 Chiller 2 DM 1.3 Mod 2 Mod 2 Radar IETM DM 2.1 DM 2.2 Technical Issue – Linkage Shipyard Design & IDE ISEA IDE (Radar) Duct 1 Updated Requirements

  4. Linkage • If design change occurs, need to identify the data modules (TM and training) affected so they can be reviewed and updated. • 1. Create Ship Alt • Identify affected support systems • Identify affected components • 2. List DM related to affected components • Need mechanism to link a DM to equipment. • Can’t always rely on DMC to provide linkage • Data modules may have been authored by vendor or other program • May utilize different business rules (applied at time of creation, not use) • Must be relationship – • DMC is generated based on business rules in effect at the time DM was created • Example – pump TM generated for carrier, reused on DDG • Assume dual use DM used to manage training and tech pubs

  5. EuroSTEP Approach

  6. Linkage • Equipment level TM • PM linked to piece of equipment • TDMIS would related PMC to APL • System level TM • PM linked to system • Individual DM linked to equipment/components within system • DM where used • Need to derive inverse relationship from PM • LSAR – already maintains relationships

  7. Questions / Issues • Linkage for DMC, PMC to product structure • DDG 1000 linker must identify linkage • GIA 0007

More Related