IDRC Maintenance Value Chain. Maintenance and Modernization Info Management. Budget Determination and Programming (TYCOM/FLT/OPNAV ). Generation of Periodic Maint. Requirements (SUBMEPP). Modernization Requirements Definition (TYCOM/NAVSEA).

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Work Identification' - gzifa


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

IDRC Maintenance Value Chain

Maintenance and Modernization Info Management

Budget Determination and Programming (TYCOM/FLT/OPNAV)

Generation of Periodic Maint. Requirements (SUBMEPP)

Modernization Requirements Definition (TYCOM/NAVSEA)

Generation of corrective maintenance requirements (Ships Force)

Mission Area

Readiness

(Surge, Deploy,

Emergency Surge)

Coordinate Maintenance Actions (RSG/NSSC/TYCOM/ISIC)

Execute Maintenance (LMA & Executing MA (RMC’s, Contractors, Warfare Centers)), including Distance Support

Readiness Assmnt’s (TSRA, 3M, ORSE, QA) (TYCOM, RMC/RSG, ISIC)

Work Definition Conference

Work Planning & Assignment

Pre-Arrival Conference

Planning Availability, including shipchecks

Work Identification

FC & Trials

Work pkg close/cert

Develop Work Pkg

Int rem & equip. diass.

Inspection & reporting

Estab. Test conditions

Restore interference

Estab.Condi for Main

Accomplish Repairs

FMAV Execution

Testing

slide3

Supporting Activities

TYCOM

NAVY

SUBMEPP

NSSC/RSG

ISIC

NAVSEA

Material

Readiness

Crew

Readiness

Policy

Technical

Support

MER

CMP

TYPICAL FMAV

Multiple Value Streams

  • Requirements
  • Priority Setting
  • CSMP
  • CMP
  • IMMPS
  • URO
  • SHIPALTs
  • Modernization
  • Training
  • Qualification
  • Plan
  • Planning & Support
  • WDC
  • Ship Check
  • Material Ordering
  • FWP Development
  • Controlled
  • Non-controlled
  • Work Sequencing
  • AIT Coordination

Work Control

WAF

SOMS

Tagout

MOAs

  • Repair
  • Interference
  • Controlled (FMA)
  • Non-controlled (SF)
  • Rigging
  • Staging
  • Component repair
  • Machining
  • Electroplating
  • Fabrication
  • SF Preservation
  • System restoration
  • Lagging
  • Calibration

Test

Test Forms

SF Coordination

Test execution

OQE

NDT

Problem resolution

DFS

Certification

material maintenance and modernization readiness and readiness indicators
Material (Maintenance and Modernization) Readiness and Readiness Indicators
  • Terms of Reference:
    • Material Readiness. The combined modernization and maintenance posture of a submarine such that a report of readiness level is a report of the probability that the submarine can achieve deployable status within the time-frame of the reported FRP status; material readiness is applied to mission areas and cannot be divorced from workforce and supply chain capacity.
    • Readiness ROI Indicators. Predictive (leading) or descriptive (lagging) measures of the probability that a submarine can achieve deployable status within the time-frame of the FRP readiness level
  • Readiness Indicators:
    • Leading indicators (predictor of success). Assessment (3M, QA, ORSE) performance, rate of accomplishment of threshold modernization (safety & environmental items), port loading, (depot: performance to contract or BPMP milestones), CSMP backlog, CASREP backlog, DFS (temporary or pending adjudication) backlog
    • Lagging indicators (document failure). Sailing Inefficiency (Fails-to-sail and unscheduled returns to port), C-3 & C-4 CASREP burdened-days,
  • Investments:
    • Material, labor (direct & distance)
    • Alteration development
    • Infrastructure
slide5

Requirements

TYCOM

ISIC

FMA

RSG/NSSC

Ship

FMA

Ship

SUBMEPP

PMT

MDCO

Prioritized

Work

RMAIS

Ship’s

Force

Work

Definition

Conference

Planning

Availability

A-28

CSMP

RSG/NSSC

Order Material

Develop FWP/CWPs

FTSC Assess

CSRR

WSR

TARGET

TAMS

Establish

Maintenance

Availability

A-30

New

Work

Establish

Budget

Pre-Arrival

Conference

A-0

FMAV EXECUTION

TYCOM

ISIC

FMA

RSG/NSSC

Ship