190 likes | 274 Views
This document discusses challenges faced while optimizing geometry, fabrication inaccuracies, and progress made in SRF CH structures. Strategies for hitting operation frequencies are highlighted, with insights from the MYRRHA project and future plans for the GSI/FAIR Injector Complex. Learn lessons from the first prototype and advancements in dynamic tuning without additional longitudinal space requirements.
E N D
Challenges, Progress andPlans of SRF CH-Structures Holger J. Podlech Institute for Applied Physics (IAP) University of Frankfurt TTC Meeting Jefferson Lab November 5th-8th 2012
CH-Structures • Crossbar H-Mode-Structure • H211-Mode • Efficient DTL-structuresforthelowand • medium energyrange • KONUS or EQUUS Layout
First CH-Prototype f=360 MHz b=0.1 Ueff=5.5 MV
Forwarded Piezosignal Pick-up Horizontal Test
Learning LessonsFromthe First Prototype Little spacebetweenstemsfortunerand power coupler changeorientation New dynamictunerwithout additional longitudinal spacerequirements Poor preparationpossibilities (only on-axis) newcleaningflanges Long end cellsforfieldenhancement (additional drift) sloped end stems
325 MHz CH-Cavity Static Tuners Bellow Tuner Power Coupler Helium Vessel
Optimization of the Geometry of Superconducting CH-Cavities Cost, Construction Time, Fabrication Inaccuracies Arrived in Frankfurt October 31st
325 MHz Cavity: Static Tuners Design Position Deviation from Design frequency: 500 kHz < 0.2%
Strategyto Hit the Operation Frequency • Fabricationinaccuracy (Δf = 0.5 MHz) • Thermal shrinkage (Δf ≈ +400 kHz) • Pressuresensitivity (Δf ≈ +200 kHz) • Surfacepreparation(Δf = 6 kHz/mm) • Microphonics(Δf = ?Hz) • Lorentz Force Detuning (Δf = ? Hz) • End celloffset 10 mm (Δf ≈ ±1 MHz) • Statictuners (Δf ≈ +1.3 MHz, -2.2 MHz) • Surfacepreparation (Δf = 6 kHz/mm) • Slow bellowtuners (Δf ≈ ±250 kHz) • Fast bellowtuner (Δf ≈± 1000 Hz)
The MYRRHA ProjectMulti Purpose HYbridResearch Reactor for High Tech Applications
The 17 MeV MYRRHA Injector sc CH-3 sc CH-4 sc CH-2 sc CH-1
cw SHE-Linac Demonstrator Tuner flange Helium vessel Preparation flange Inclined end stem Pickup flange Coupler flange
Setup for Beam Tests at GSI 217 MHz Demonstrator 108.4 MHz RFQ 108.4 MHz IH-Cavity