Designers’ Manual Overview and Chapter Contents

Designers’ Manual Overview and Chapter Contents. Training Session for LGIs June 20, 2018. PURPOSE: Help Develop and Execute Projects. CHAPTER 1: INTRODUCTION 1.01 PURPOSE

griselda
Download Presentation

Designers’ Manual Overview and Chapter Contents

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Designers’ ManualOverview and Chapter Contents Training Session for LGIs June 20, 2018

  2. PURPOSE:Help Develop and Execute Projects CHAPTER 1: INTRODUCTION 1.01 PURPOSE The Designers’ Manual provides standards, criteria, and guides for the development and execution of capital projects pursued under State Building Commission Authority. …augments but does not replace…the SBC-6 Standard Form of Agreement between Owner and Designer.

  3. OWNER INFORMATION:System or Campus Specific • Contact information • Staff contact information • Team roles • Campus-specific payment processes • Deliveries to campus • Requirements related to traffic, parking, and pedestrians circulation at and around construction site • Coordination with City/Campus utilities • Local plans review process • Plans rooms locations/contacts/website links • Other as needed Template provided for LGIs to modify as desired.

  4. Chapters:Sequenced Like a Project Chapter 1: Introduction Chapter 2: Designer Agreement and Payments Chapter 3: Design Chapter 4: Project Manual Guide Chapter 5: Procurement Chapter 6: Construction Chapter 7: Closeout and Record Documents

  5. Appendices:Project Admin Guidance and Tools Appendix 1:Administrative Forms Appendix 2:Standard Bidding and Construction Documents Appendix 3:System or Campus Specific Guidelines and Requirements

  6. Chapter 1:INTRODUCTION 1.01 PURPOSE 1.02 ORGANIZATION 1.03 REVISIONS 1.04 THE STATE AS OWNER 1.05 STATE ORGANIZATION REFERENCE LIST 1.06 SELECTION OF DESIGNER

  7. Chapter 1:INTRODUCTION 1.01 PURPOSE 1.02 ORGANIZATION 1.03 REVISIONS 1.04 THE STATE AS OWNER 1.05 STATE ORGANIZATION REFERENCE LIST 1.06 SELECTION OF DESIGNER

  8. Chapter 1:INTRODUCTION (continued) 1.07 OVERVIEW FLOW CHART FOR DESIGN/BID/BUILD PROJECTS 1.08ELECTRONIC SIGNATURES, COUNTERPARTS, AND PHOTOCOPIES

  9. Chapter 2:DESIGNER AGREEMENTSAND PAYMENTS 2.01 STANDARD FORMS OF AGREEMENTAnDATTESTATION FORM 2.02 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGNER 2.03 STANDARD FORM OF SUPPLEMENT TO AGREEMENT BETWEEN OWNER AND DESIGNER

  10. Chapter 2:DESIGNER AGREEMENTSAND PAYMENTS (continued) 2.04 ADDITIONAL SERVICES PROVIDED UNDER AGREEMENTS 2.05 REIMBURSABLE EXPENSES INCURRED UNDER AGREEMENTS 2.06 PAYMENTS TO DESIGNERS 2.07 EXAMPLE INVOICE FORMATS

  11. Chapter 3:DESIGN 3.01 GENERAL 3.02 REGULATORY 3.03 OWNER consultant reviews 3.04 HIGH PERFORMANCE BUILDING REQUIREMENTS 3.05 SPACE EFFICIENCY AND COST ANALYSIS

  12. Chapter 3:DESIGN (continued) 3.06 PROGRAM PHASE 3.07 SCHEMATIC DESIGN PHASE 3.08 DESIGN DEVELOPMENT PHASE 3.09 CONSTRUCTION DOCUMENT PHASE 3.10 FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ADDITIONAL SERVICES

  13. Chapter 4:PROJECT MANUAL GUIDE 4.01 GENERAL 4.02 INSTRUCTIONS FOR SELECTED STANDARD DOCUMENTS (listed on next slide) 4.03 SPECIFICATIONS INSTRUCTIONS

  14. Section 4.02:SELECTED STANDARD DOCS 00 00 01 Project Title Page 00 11 16 Invitation to Bid00 11 19 Request for GMP00 11 19 Invitation to Bid – Non-Construction 00 41 13 Bid Form 00 41 63 Bid and Agreement Form – Non-Construction

  15. Section 4.02:SELECTED DOCS (continued) 00 42 23 GMP Summary00 42 71 GMP List of Trade Subcontracts00 42 75 GMP Disclosure of General Conditions 00 61 43 Three Year Roof Bond 00 72 13 General Conditions of the Contract for Construction 00 72 13.2 Supplementary Conditions – Demolition Requirements

  16. Section 4.02:SELECTED DOCS (continued) 01 11 00 Summary 01 21 13 Allowances 01 21 15 List of Allowances 01 22 13 Unit Prices 01 22 15 List of Unit Prices 01 23 00 Alternates 01 57 23 Temporary Storm Water Pollution Control

  17. Section 4.02:SELECTED DOCS (continued) 01 74 00 Cleaning and Waste Management 01 78 01 Closeout Submittals01 78 02 Closeout Submittals 01 91 13 Commissioning01 91 23 Performance Testing Identification Form01 91 26 Performance Testing Procedures Form01 91 29 Functional Performance Test Certification

  18. Section 4.02:SELECTED DOCS (continued) 07 50 35 Existing Roofing System Warranty 07 50 36 Total Roofing System Warranty07 61 02 Twenty Year Total Metal Roofing System Warranty

  19. Chapter 5:PROCUREMENT 5.01 CONSTRUCTION PROCUREMENT DELIVERY METHODS 5.02 INITIATION OF THE BIDDING PHASE 5.03 PRE-BID CONFERENCE AND ADDENDA 5.04 BID TAB (TABULATION) PREPARATION 5.05 BID OPENING PREPARATION

  20. Chapter 5:PROCUREMENT (continued) 5.06 BID OPENING 5.07 COMMUNICATION OF APPARENT RESULTS 5.08 DISPOSITION OF BIDS 5.09 AWARD OF CONTRACT 5.10 DESIGNER EVALUATION FOR DESIGN AND BIDDING PHASES

  21. Chapter 6:CONSTRUCTION 6.01 APPLICABILITY TO NON-CONSTRUCTION PROJECTS 6.02 PRE-CONSTRUCTION CONFERENCE 6.03 NOTICE TO PROCEED and CONTRACT TIME 6.04 Logs, Progress Observations, and Field Reports

  22. Chapter 6:CONSTRUCTION (continued) 6.05 Initial SUBMITTALS 6.06 RESPONSE EXPECTATIONS: 6.07 Allowances AND Unit Price BASED ALLOWANCES 6.08 PLANNING FOR CHANGES IN WORK 6.09 Subcontractor REPLACEMENT 6.10 Designer’s Order for a Minor Change

  23. Chapter 6:CONSTRUCTION (continued) 6.11 Request for Proposal (RFP) 6.12 Claims and Proposals 6.13 Amendments 6.14 CHANGE ORDERS AND DIRECTIVES 6.15 CM/GC Contingency, Reserve Funds, and Pushes 6.16 CONTRACTOR APPLICATIONS FOR PAYMENT

  24. Chapter 6:CONSTRUCTION (continued) 6.17 PROGRESS MEETINGS 6.18 PRE-CLOSE-OUT SUBMITTALS 6.19 SUBSTANTIAL COMPLETION 6.20 modifications after substantial completion

  25. Chapter 6:CONSTRUCTION (continued) 6.21 FINAL INSPECTION 6.22 Contractor’s record documents and data binders 6.22 DESIGNER EVALUATION FOR CONSTRUCTION PHASE

  26. Chapter 7:CLOSEOUT ANDRECORD DOCUMENTS 7.01 final payment to contractor 7.02 Designer’s RECORD Drawings, Information, and Instructions 7.03 ONE-YEAR CORRECTIVE INSPECTION