slide1
Download
Skip this Video
Download Presentation
EURO 

Loading in 2 Seconds...

play fullscreen
1 / 10

EURO  - PowerPoint PPT Presentation


  • 125 Views
  • Uploaded on

EURO . A High Intensity Neutrino Oscillation Facility in Europe. Introduction Superbeam Neutrino Factory Beta beams Detectors Physics Possible next steps. EUROnu. FP7 Design Study

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'EURO ' - graceland


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
EURO

A High Intensity Neutrino Oscillation Facility in Europe

  • Introduction
  • Superbeam
  • Neutrino Factory
  • Beta beams
  • Detectors
  • Physics
  • Possible next steps
euronu
EUROnu
  • FP7 Design Study
  • Due to limited funds: focus on possible “next” generation neutrino oscillation facilities in Europe
    • CERN to Frejus superbeam
    • Neutrino Factory (in collab. with IDS-NF)
    • Beta beams
  • + performance of baseline detectors and physics reach
  • Output: comparison of physics, “cost” & risk
  • Reported to CERN Council via SG/ECFA
  • Project started: 1st September 2008
  • Duration: 4 years – completion in August 2012
euronu status
EUROnu Status
  • Baselines largely defined
  • Design work still continues
  • Moving more towards “engineering”
  • Costing:
    • WBS being done
    • Framework being created using cost tool
    • Workshop planned soon
  • Safety and risk also to be done
  • Midterm technical review on 14th April
  • 17 months left!
super beam
Super-Beam
  • Design of CERN to Frejus SB based on SPL
neutrino factory
Neutrino Factory
  • Close collaboration with IDS-NF
  • IDR completed

Muon front-end

Muon acceleration

beta beam
Beta-Beam
  • Main issue in EUROnu: maximise ion production
  • 2 options being considered: - 6He & 18Ne → baseline - 8Li & 8B back-up
detectors
50-100 m

15 m

n beam

50-100kT

15 m

B=1 T

iron (3 cm)

+ scintillators (2cm)

  • Limited funding: only performance and “cost”
  • Concentrate on baseline detectors
    • Magnetised Iron Neutrino Detector - NF
    • Large water cherenkov – SB and BB
    • Near detectors
  • Closely linked to IDS
Detectors
physics
Physics performance
  • Optimisation:
    • baselines and energies
    • synergies: experimental setups and facilities
  • Systematics
Physics
next steps
Next Steps
  • Technical review: 14th April
  • ECFA Neutrino Panel: now!
  • CERN Strategy Review: kick-off this summer finish next summer/autumn
  • EUROnu contribution under discussion: - input before EUROnu finished - agreement is combined input from: EUROnu LAGUNA-LBNO IDS etc
  • EUROnu final report will also go to Council
  • EUROnu future: also under discussion - would like to continue - how needs to be determined
ad