1 / 9

CSeON WG (GSSM#12) Agenda

CSeON WG (GSSM#12) Agenda. GISFI # 12, Mar 12-13, 2013, Pune Chair: Parag Pruthi, NIKSUN Vice-Chair: Niranth, Huawei. Agenda. Sharing of CSeON WG GSSM #11 Report Status of CSeON WG Deliverables CSeON WG GSSM #12 Agenda. GSSM #11 Report. Topics discussed during GISFI #11 Deliverables

grace
Download Presentation

CSeON WG (GSSM#12) Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSeON WG (GSSM#12) Agenda GISFI # 12, Mar 12-13, 2013, Pune Chair: Parag Pruthi, NIKSUN Vice-Chair: Niranth, Huawei GISFI#12, Mar 12-13 2013

  2. Agenda • Sharing of CSeON WG GSSM #11 Report • Status of CSeON WG Deliverables • CSeON WG GSSM #12 Agenda

  3. GSSM #11 Report • Topics discussed during GISFI #11 • Deliverables • CSeON objectives and draft charter was presented. • Emergency Telecom Services TR text was approved. • Carrier Grade Cloud Computing TR text was approved. • Information Management TR focus presentation was discussed. SID+TOGAF+Frameworx for setting up an effective Enterprise Business Architecture. • Library Use case for Cloud Computing was discussed. Document was not uploaded after the meeting. • CSeON Business Case presentation was discussed. • Liaisons • IEEE P1903 - Done • IETF IAB, TEC (I & NGN), IEEE-SA India – In Progress • Preparatory meeting for GSSM#11 (Minutes circulated and approved)

  4. Between GSSM #11 and GSSM#12 • Communication with IEEE-SA Emergency Warning Systems (EWS) Study Group (2nd Jan’13) • Syam Madanapalli shared the IEEE-SA perspective on EWS • GISFI CSeON studied the input material. • GISFI CSeON WG formulated the following working method with IEEE-SA • MoU with IEEE-SA India • Joint project on Common Emergency System (CES) topic. • Also formally work on other topics with IEEE-SA India. • Conference Call on Emergency Telecom Services (27th Feb’13) • Discussed areas for contributions. • Initiated call for contributions from GISFI members towards this topic. • Preparatory meeting for GSSM#12 (8th Mar’13 - Minutes circulated for review) • Discussed CSeON Topic overall focus areas and work strategy. • Identified the need for the topic “Mobility for Cloud”

  5. CSeON TR Map TR1: Framework TR7 TR8 Library Cloud VoIP CES (TRAI) TR2: Business models Services BSS/OSS Voice MM BB Emergency VAS Convergence of Services Usage TR4: CG-Cloud TR3: Information Mgmt Service/Transport Infra Cloud Common Platform IMS NGN Web Cloud EPC Provisioning (Packet/Circuit) Networks GIS Platform Convergence of Networks PSTN GSM CDMA LTE WiFi Migration Devices PC Mobile STB Tablet POTS Convergence of Devices Billing SEC QoS Mob TR5 TR6 GISFI#XX, Date

  6. Strategy for 2013 (Suggestion) • Produce baseline version of the common TRs like TR1, TR2 and TR3 mapped based on the NTP 2012 objective and strategy. • Provide TR1, TR2 & TR3 as approach paper for TEC/TRAI towards the “Convergence” objective and strategy defined in NTP 2012. • Contribute India specific “Convergence” requirements and Standards inputs to International SDOs like ITU-T, IEEE-SA, 3GPP. • Provide Rel 1 of all other TRs. Close TRs which are not in scope. • Study specific topics like VoIP as new WI. • Setup better working relationships with other SDOs (IEEE-SA) through MoU and joint projects.

  7. CSeON WG Deliverables - Status • Technical Reports Status • TR1: CSeON Requirements and Framework (In Progress – 90%) – NIKSUN (Rapporteur), Huawei • TR2: CSeON Business Models (In Progress – 2 sections to be closed) – NEC (Rapporteur) • TR3: Information Management (Open) – Basavaraj (Rapporteur) • TR4: Carrier Grade Cloud Computing (In Progress – 5%) – Huawei (Rapporteur) • TR5: Security and Monitoring Requirements for Cloud Computing (Open) – NIKSUN (Rapporteur) • TR6: QoS for Cloud Computing (Open) – TCS (Rapporteur) • TR7: Emergency Telecom Services (In Progress – 15%) – NEC (Rapporteur) • TR8: Knowledge Network - Use case for Cloud Computing) – I2TB (Rapporteur)

  8. GSSM #12 Agenda • CSeON WG Agenda (Niranth-Huawei) – For Approval • CSeON WG 2013 Work Strategy (Niranth-Huawei) – For Discussion • CSeON GSSM#12 Preparatory meeting minutes (Niranth-Huawei) – For Approval • Emergency Telecom Services (Ritesh-NEC, Siva-NEC) – For Approval • Information Management TR (Basavaraj) – For Approval • Mobile Cloud (Basavaraj) – For Discussion • Carrier Grade Cloud Computing (Niranth-Huawei) – For Approval

  9. Thank You!

More Related